Radon protection for new domestic extensions and conservatories with solid concrete ground floors (GG 73 revised)
BRE (Building Research Establishment) is an independent, research-based consultancy, testing and training organisation, operating in the built environment and associated industries.
Radon protection for new domestic extensions and conservatories with solid concrete ground floors (GG 73 revised) was written by Chris Scivyer and published by BRE on 13 January 2015.
It replaces guidance published in 2008 and should be read in conjunction with BRE Report BR 211, Radon: guidance on protective measures for new buildings. Two companion Good Building Guides cover radon-protective measures for new dwellings and new large buildings such as workplaces.
Radon is a natural, colourless, odourless, radioactive gas formed by the radioactive decay of small amounts of uranium that occur naturally in all rocks and soils. It can move through cracks and fissures in the subsoil and eventually to the atmosphere. Most of this radon will disperse harmlessly into the outdoor air, but some will collect in spaces under or within buildings.
This 8-page Good Building Guide gives practical advice about the installation of radon-protective measures in new domestic extensions and conservatories with solid concrete ground floors. It will also help house owners and builders in radon-affected areas assess whether protection is needed for a new extension or conservatory and determine the level of protection that is required.
The contents of the guide are:
- What is radon and why consider it for new extensions?
- UK building regulations.
- Determining whether radon protection is needed.
- Protective measures-Basic radon protection.
- Radon barriers.
- High water table.
- Fill and blinding.
- Maintaining ventilation to existing suspended ground floors.
- Subfloor depressurisation and sumps.
- References.
- Further reading.
[edit] Find out more.
[edit] Related articles on Designing Buildings Wiki
- BRE articles on Designing Buildings Wiki.
- BRE Buzz articles on Designing Buildings Wiki.
- BRE Buzz.
- BREEAM.
- Building Research Establishment.
- Contaminated land.
- Cover systems for land regeneration - thickness of cover systems for contaminated land (BR465).
- Ground conditions.
- Methane and other gasses from the ground.
- Radon.
- Radon: Guidance on protective measures for new buildings BR 211.
- Radon protection for new dwellings GG 74.
- Radon protection for new large buildings GG 75.
- Radon solutions in older homes GR 38.
- Site appraisal.
- Site investigation.
- Soil survey.
- Solid and liquid contaminants risk assessments.
Featured articles and news
CIAT responds to the updated National Planning Policy Framework
With key changes in the revised NPPF outlined.
Councils and communities highlighted for delivery of common-sense housing in planning overhaul
As government follows up with mandatory housing targets.
CIOB photographic competition final images revealed
Art of Building produces stunning images for another year.
HSE prosecutes company for putting workers at risk
Roofing company fined and its director sentenced.
Strategic restructure to transform industry competence
EBSSA becomes part of a new industry competence structure.
Major overhaul of planning committees proposed by government
Planning decisions set to be fast-tracked to tackle the housing crisis.
Industry Competence Steering Group restructure
ICSG transitions to the Industry Competence Committee (ICC) under the Building Safety Regulator (BSR).
Principal Contractor Competency Certification Scheme
CIOB PCCCS competence framework for Principal Contractors.
The CIAT Principal Designer register
Issues explained via a series of FAQs.
Conservation in the age of the fourth (digital) industrial revolution.
Shaping the future of heritage
Embracing the evolution of economic thinking.
Ministers to unleash biggest building boom in half a century
50 major infrastructure projects, 5 billion for housing and 1.5 million homes.
RIBA Principal Designer Practice Note published
With key descriptions, best practice examples and FAQs, with supporting template resources.
Electrical businesses brace for project delays in 2025
BEB survey reveals over half worried about impact of delays.
Accelerating the remediation of buildings with unsafe cladding in England
The government publishes its Remediation Acceleration Plan.
Airtightness in raised access plenum floors
New testing guidance from BSRIA out now.