Self-build home: Construction
Introduction.
The construction stage is the process of constructing the works described in the design drawings and specifications. At the end of the stage, the self-build home should be ready for occupation, although the contractor may be required to return to the site, even after occupation, to rectify any defects that appear.
Depending on the procurement route that has been adopted, tasks in this stage, may be undertaken by the self builder, the contractor(s), consultants or the kit-house supplier.
Throughout this stage, it may be necessary to procure items outside of the construction contract that will be required to occupy the home, such as; furniture, kitchen equipment, ICT equipment and so on.
Be aware that whilst self-build clients are ‘domestic clients’ for the purposes of the Construction (Design and Management) Regulations, they can attract health and safety duties under Part 4 of the regulations if they control the way in which construction work is carried out. See CDM for self-builders and domestic clients for more information.
- Ensure site induction talks are carried out, explaining key safety issues and site organisation.
- Introduce a signing in and signing out book for all personnel.
- When appropriate, issue notices for each trade contractor to commence work on site along with instructions regarding phasing and sequencing of the work.
- Co-ordinate the preparation of any additional information required by the trade contractors for construction.
- Where there are proposed variations to the agreed works the self builder should give careful consideration to costs that may be incurred and should assess any alternative options.
- Regular inspections should be carried out and progress photos taken. In particular, photograph defective work before any remedial works are carried out and record the date the photos were taken.
- There should be regular construction progress meetings to assess progress against the programme, resolve design issues, inspect samples, and discuss the organisation of the next stage of the construction works.
- It is important to keep all contractors and suppliers informed about the progress of the project so they are able to plan their manufacture and installation works before receiving a notice to commence work. They will have a number of clients to satisfy and are likely to favour those that allow them to maximise their efficiency.
- Visit major supplier’s factories to check work is in progress and products are as ordered.
- Regular payments must be made to contractor(s) in accordance with the requirements of the contract.
- Throughout the project gather any product literature supplied with goods. File these in preparation for creating an operation and maintenance manual.
- Co-ordinate the utility companies to install meters and connect the permanent services.
- As the construction nears completion, agree procedures for inspections, commissioning, and testing building services.
- Ensure contractor(s) rectify any defects that become apparent during commissioning, testing and inspection procedures.
- Arrange for final inspection of the works by the building control inspector (or approved inspector) and arrange for them to issue a building regulations completion certificate.
- If the works (or trade contracts) are complete, certify practical completion. See practical completion for more information.
- Make any payments due.
- Inform insurers of completion.
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.