Securing planning permission for self-build homes
Building your own home is an exciting prospect, but navigating the complexities of the planning process can be a real turn-off for many prospective self-builders. However planning doesn't have to be a nightmare. Steve Mansour, Group CEO at CRL, talks through the process and explains the types of permissions a self-build project will need.
Contents |
[edit] Introduction
With government moves to encourage self-building and the popularity of TV programmes like Grand Designs the UK public's desire to construct their own homes has significantly increased.
The appetite for self-build is clear – with around 12,000 new homes (or between 7-10 per cent of the UK's new housing stock) thought to be constructed in this way every year. Support for self-build projects has also been one of the government's key housing initiatives, making loans available to community groups and releasing public land to accommodate new houses.
[edit] Self-build planning
Unless you're fortunate enough to be an architect or qualified designer yourself, after you've found a suitable plot of land (although you don't necessarily need to have bought it to gain planning permissions), you are likely to need to appoint some professionals.
Some self-builders opt to use a project manager as a way to run the entire project at arm's length, while others opt to pick architects, designs and surveyors themselves.
In 2015 the new Construction (Design & Management) Regulations 2015 (CDM 2015) were introduced and as a result there is now a requirement for domestic client’s to understand the Health and Safety requirements of a project. However, their duties are normally transferred to the contractor, on a single contractor project; or the principal contractor, on a project involving more than one contractor (the client can still choose to have a written agreement with the principal designer to carry out the client duties). So having a professional team to guide you through the planning process is becoming essential.
Whatever route you go down, it's in your best interest to kick off the planning process as soon as you can. Consulting with the local authority's planning department – either yourself or by proxy – is a great way to determine what you will, and won't, be able to do.
Your local planning department is likely to have some preliminary guidance on their website, if not a full copy of the 'Local Plan' that informs planning constraints in the area.
However, councils also offer more formal pre-application advice for a fee, although the cost – and quality – of this can differ greatly from authority to authority. This should hopefully give you a better idea of the key issues that may arise and take steps to sidestep or tackle these as necessary.
This guidance can be used to inform your design and when you're happy with the plans, you can formally submit them for planning approval. This will typically cost under £200, but can differ depending on where your new home is to be situated.
[edit] Timing
While central government has set a target of eight weeks for planning applications to be assessed, some councils are better than others. However, there are financial incentives in place to encourage this and even the worst performers shouldn't make you wait an onerous length of time for a response.
You will be able to track the progress of your application through the local authority's website and find out if any problems have been identified. Local planners are highly risk averse and in some cases it can be worth withdrawing and re-submitting an application that encounters difficulties, rather than waiting for refusal.
However, we'd always advise consulting with a professional, if possible, before making any rash decisions regarding your application.
[edit] Refusal and appeals
Having your self-build plans refused by a local authority can jeopardise the chances of your project ever coming to fruition in its current form. Given the increasing pressure local planners are under, previous refusals can fuel future ones – making a proposed site untenable in the eyes of the local authority.
You can however appeal to the Department of Communities and Local Government's Planning Inspectorate if you think the application has been refused out of hand.
This comes with its own set of complications and you're likely to have to wait for at least a year for a response after lodging your appeal. It is well worth talking to a professional consultant before deciding how to handle rejection.
[edit] Post-planning
If everything goes smoothly and you're granted permission without any constraints – the paperwork, unfortunately, doesn't end there.
You will still need to ensure the project adheres to UK Building Regulations, a code which governs the safety and structural integrity of a proposed building.
Unlike planning permission – Building Regulations are less open to interpretation and your project will succeed or fail based on whether it meets their criteria or not. You can find out more about these – and how to go about gaining approval – at the government's planning portal at: www.planningportal.gov.uk
Finally as someone who sees successful self-build projects come to fruition regularly, I hope you are not deterred from building your own home. Constructing your own home is an exciting, and a highly rewarding, project and if the above guidelines are followed should be a relatively smooth process.
For more information see: Self-build home: Submit a planning application
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.