Self-build home: Submit a planning application
Introduction.
Depending on the procurement route that has been adopted, activities in this stage may be carried out by the self builder, their consultants, a design and build contractor or a kit house supplier.
Before construction can begin, it is necessary to obtain planning permission. Many clients will be unwilling to commit to paying fees for detailed design until they have received planning permission, and on particularly high-risk projects, the client may wish to obtain outline planning permission before they committ to any significant expenditure.
An application for planning permission may be a detailed planning application, or if there was already an outline planning permission for the site, may be a reserved matters application for the details of the design.
Before making a planning application it is important to contact the local planning authority:
- To find out when planning meetings are held and what procedures are followed.
- To agree the information that will be provided in the application and the fee payable.
- To gauge their likely reaction to the proposed development.
- To discuss planning conditions or planning obligations that may be imposed on the development (self-build homes are exempt from the Community Infrastructure Levy).
Records should be kept of all communications with the local planning authority.
For information about what might be required as part of a planning application see Detailed planning application. There may be additional requirements for developments in conservation areas, or works to listed buildings.
It is important that the self builder checks a draft planning application before it is submitted to ensure it properly reflects the agreed design and that the proposed project is affordable.
Once an application has been submitted, it may be necessary to respond to questions from the local planning authority and it can be beneficial to make representations to the planning committee. After consideration of comments received, or following the decision (which may include planning conditions or planning obligations), it may be appropriate to submit a revised application, or to lodge a planning appeal.
If the site does not have a postal address, an application to obtain one should be made once planning permission has been granted. Utilities companies will be reluctant to connect services without a formal postal address. See applying for new postal addresses for more information.
See also the government guide Better connected: a practical guide to utilities for home builders.
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.