Applying for new postal addresses
The glossary of statistical terms, published by the Organisation for Economic Co-operation and Development (OECD), defines an address as: ‘A number or similar designation that is assigned to a housing unit, business or any other structure. Addresses mainly serve postal delivery, but are also important for administrative purposes, for example in civil registration systems and in census taking.’
New developments or the conversion of existing premises may result in the need for new postal addresses.
It is important to apply for a postal address as early as possible, ideally, as soon as planning permission has been granted. Utility companies may be reluctant to connect services to properties that do not have official postal addresses, and it may be important to secure addresses for marketing and sales purposes. Obtaining a new postal address may involve naming new roads. This can take time to agree and can cause problems with sales if the process is not begun early enough.
Local authorities have statutory responsibility for naming streets and numbering properties. Applications are generally made to the Local Land and Property Gazetteer (LLPG) team or the Street Naming and Numbering (SNN) team.
A postal address may be applied for by individuals or developers by completing an application form (or sometimes by writing a letter or emailing the local authority) and may need to be accompanied by a drawing showing the extent of the premises, and relevant planning permissions. A fee is chargeable for applications.
The local authority will check there are no similar addresses within the same post code or in a neighbouring area and will consult with the Highways department.
If the application is approved, an approval notice will be sent to the applicant confirming the addresses, with a drawing show any agreed new streets and property numbers. Details will also be issued by the local authority to the emergency services, statutory authorities and the Royal Mail, who are responsible for allocating postcodes.
New addresses are allocated in accordance with British Standard 7666 and are compiled and recorded by the National Land and Property Gazetteer (NLPG).
[edit] Related articles on Designing Buildings
Featured articles and news
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.