Primavera PM
This article needs more work. To help develop this article, click 'Edit this article' above.
Primavera Systems Inc was a private company providing Project Portfolio Management (PPM) software to help project-intensive companies plan, manage and control projects and portfolios of all sizes. It was established in 1983 by Joel Koppelman and Dick Faris.
In 2009, the USA-based multinational computer technology corporation, Oracle, acquired Primavera and formed the Primavera Global Business Unit (PGBU).
Oracle Primavera now offers PPM solutions for project-intensive industries such as aerospace and defence, utilities, chemicals, manufacturing, financial services, communications, travel and transportation, healthcare, and government.
Software solutions include:
- Primavera P6 Analytics.
- Primavera P6 Enterprise Project Portfolio Management.
- Primavera P6 Professional Project Management.
- Primavera Contract Management.
- Primavera Contractor.
- Primavera Earned Value Management.
- Primavera Inspire for SAP.
- Primavera Portfolio Management.
- Primavera Risk Analysis.
Within architecture, engineering, construction and project management, Primavera software can be used to plan, manage, control, and deliver projects and programmes. It can help manage resource allocation, cost reduction, supply-chain efficiency, and decision-making by offering real-time data, and web-based collaborative tools. It can be used for large or small projects, for client capital programme management and for contractor engineering and construction.
- Primavera P6 'Enterprise Project Portfolio Management' and Primavera P6 'Professional Project Management' offer real-time project planning and program management tools, collaborative scheduling with interactive Gantt charts, capacity planning, ‘what-if’ scenario modelling and resource management.
- Primavera 'Contract Management' provides document management, job cost, and project control tools. It is available on a collaborative platform, giving the whole team access to current drawings, events, requests for information (RFIs), answered questions, potential issues, and changes.
- Primavera 'Contractor' offers contractor-specific scheduling, reporting, and progress planning tools.
[edit] Related articles on Designing Buildings Wiki
- Acceleration.
- Activity schedule.
- Critical path method.
- Design programme.
- Design web.
- Earned value.
- Fast-track construction.
- Gantt chart.
- Key performance indicators.
- Lead time.
- Project manager.
- Programme.
- Scheduling construction activities.
[edit] External references
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























