NRM3
The New Rules of Measurement (NRM) are published by the Royal Institute of Chartered Surveyors (RICS), prepared by the Quantity Surveying and Construction Professional Group. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects. Adopting a standard methodology such as NRM facilitates consistency and benchmarking and helps avoid disputes.
NRM is a suite of documents, comprising three volumes:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works (replacing the Standard Method of Measurement, seventh edition SMM7).
- NRM 3: Order of cost estimating and cost planning for building maintenance works.
Together this suite of documents offers a cradle-to-grave approach to cost estimating, works procurement and post-construction procurement.
NRM 3 is intended to provide a consistent method for the quantification and description of maintenance works. It was published in March 2014 and is available from the RICS website.
NRM3 can be used for:
- Initial order of cost estimates during preparation stages.
- Cost plans during the design development and pre-construction stages.
- Asset-specific cost plans during the pre-construction phases.
It also offers guidance about:
- The procurement and cost control of maintenance works.
- The measurement of other items associated with maintenance works that are not included in work items.
The rules for NRM3 follow the same framework and premise as NRM1: Order of cost estimating and cost planning for capital building works.
NB The New Rules of Measurement are accompanied by the 'Black Book', the QS and construction standards. Together they provide a suite of tools that will help the construction industry work more collaboratively and consistently.
[edit] Related articles on Designing Buildings Wiki
- Bill of quantities.
- Common Arrangement of Work Sections (CAWS).
- Comparison of SMM7 with NRM2.
- Cost plans.
- External works.
- Measurement.
- New Rules of Measurement.
- NRM1.
- NRM2.
- Schedule of work.
- Standard Method of Measurement (SMM7).
- Tender.
- Tender documentation.
- Uniclass.
[edit] External references
Featured articles and news
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.


















Comments
err... WHERE is it?
http://www.rics.org/uk/shop/NRM-3-Order-of-cost-estimating-and-cost-planning-for-building-maintenance-works-19866.aspx