NRM1
The New Rules of Measurement (NRM) are published by the Royal Institution of Chartered Surveyors (RICS) and prepared by the Quantity Surveying and Construction Professional Group. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects. Adopting a standard methodology such as NRM facilitates consistency and benchmarking and helps avoid disputes.
NRM is a suite of documents, comprising three volumes:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works (replacing the Standard Method of Measurement, seventh edition SMM7).
- NRM 3: Order of cost estimating and cost planning for building maintenance works.
NRM1 was first published in February 2009 as the RICS new rules of measurement: Order of cost estimating and elemental cost planning. A second edition was published in 2012, renamed RICS new rules of measurement: Order of cost estimating and cost planning for capital building works. It was renamed to better distinguish between capital building works and building maintenance works. Amongst other changes, the arrangement of elements was also revised. The second edition became operative on 1 January 2013.
NRM2 was published in April 2012. It became operative on 1 January 2013 and formally replaced the Standard Method of Measurement, seventh edition (SMM7) on 1 July 2013.
NRM3 was published in March 2014.
NRM 1 is a best practice guidance note offering guidance on the preparation of:
- Order of cost estimates.
- Elemental cost models.
- Cost plans.
- Cost analyses.
- Benchmark analyses.
It also provides guidance on:
- Capturing historical cost data for order of cost estimates and elemental cost plans.
- How to describe and quantify items not included in measurable building work items, such as; preliminaries, overheads and profit, consultant fees, risk allowances, inflation, and so on.
NRM1 comprises four parts:
- Part 1 sets out the context and definitions.
- Part 2 explains how to prepare an order of cost estimate.
- Part 3 explains how to prepare an elemental cost plan.
- Part 4 provides tabulated rules of measurement for the preparation of cost plans.
NB The New Rules of Measurement are accompanied by the 'Black Book', the QS and construction standards. Together they provide a suite of tools to help the construction industry work more collaboratively and consistently.
[edit] Related articles on Designing Buildings
- Benchmarking.
- Black book.
- Comparison of SMM7 with NRM2.
- Cost plans.
- Elemental cost plan.
- Measurement.
- NRM.
- NRM2.
- NRM3.
- Standard Method of Measurement (SMM7).
[edit] External references
Featured articles and news
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Comments
Where can I borrow, view, buy this from? No link?
http://www.rics.org/uk/shop/NRM-1-Order-of-Cost-Estimating-and-Cost-Planning-for-Capital-Building-19143.aspx