NRM1
The New Rules of Measurement (NRM) are published by the Royal Institution of Chartered Surveyors (RICS) and prepared by the Quantity Surveying and Construction Professional Group. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects. Adopting a standard methodology such as NRM facilitates consistency and benchmarking and helps avoid disputes.
NRM is a suite of documents, comprising three volumes:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works (replacing the Standard Method of Measurement, seventh edition SMM7).
- NRM 3: Order of cost estimating and cost planning for building maintenance works.
NRM1 was first published in February 2009 as the RICS new rules of measurement: Order of cost estimating and elemental cost planning. A second edition was published in 2012, renamed RICS new rules of measurement: Order of cost estimating and cost planning for capital building works. It was renamed to better distinguish between capital building works and building maintenance works. Amongst other changes, the arrangement of elements was also revised. The second edition became operative on 1 January 2013.
NRM2 was published in April 2012. It became operative on 1 January 2013 and formally replaced the Standard Method of Measurement, seventh edition (SMM7) on 1 July 2013.
NRM3 was published in March 2014.
NRM 1 is a best practice guidance note offering guidance on the preparation of:
- Order of cost estimates.
- Elemental cost models.
- Cost plans.
- Cost analyses.
- Benchmark analyses.
It also provides guidance on:
- Capturing historical cost data for order of cost estimates and elemental cost plans.
- How to describe and quantify items not included in measurable building work items, such as; preliminaries, overheads and profit, consultant fees, risk allowances, inflation, and so on.
NRM1 comprises four parts:
- Part 1 sets out the context and definitions.
- Part 2 explains how to prepare an order of cost estimate.
- Part 3 explains how to prepare an elemental cost plan.
- Part 4 provides tabulated rules of measurement for the preparation of cost plans.
NB The New Rules of Measurement are accompanied by the 'Black Book', the QS and construction standards. Together they provide a suite of tools to help the construction industry work more collaboratively and consistently.
[edit] Related articles on Designing Buildings
- Benchmarking.
- Black book.
- Comparison of SMM7 with NRM2.
- Cost plans.
- Elemental cost plan.
- Measurement.
- NRM.
- NRM2.
- NRM3.
- Standard Method of Measurement (SMM7).
[edit] External references
Featured articles and news
The Home Energy Model and its wrappers
From SAP to HEM, EPC for MEES and FHS assessment wrappers.
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.


























Comments
Where can I borrow, view, buy this from? No link?
http://www.rics.org/uk/shop/NRM-1-Order-of-Cost-Estimating-and-Cost-Planning-for-Capital-Building-19143.aspx