Building envelope
According to Approved Document L2B: conservation of fuel and power in existing buildings other than dwellings, the term 'building envelope' refers to:
| ...the walls, floor, roof, windows, doors, roof windows and roof lights. |
Together, these form the physical separation between the interior and exterior, that is, the climatic modifier that creates and contains the internal conditions.
The nature of the building envelope is likely to depend on a wide range of requirements, some of which may be in conflict:
- The type of building.
- Its location and context.
- Its form.
- Regulatory requirements.
- Local climatic conditions.
- The internal conditions required.
- The need for openings, views, security, safety, access, privacy and so on.
- Available materials.
- Structural requirements.
- Building services strategy,
- Sustainability requirements.
- Maintenance and cleaning requirements.
- Rainwater run off.
- Durability, flexibility and expected life.
- The method of construction, deconstructability and recyclability.
- Stylistic requirements.
- Budgetary and time constraints.
NB According to Approved Document L1A:
| The envelope area of a terraced house includes the party wall(s). The envelope area of a flat in a mulit-storey building includes the floors, walls and ceilings which are shared with adjacent flats. |
And, in relation to air permeability:
| The envelope area, or measured part of the building, is the total area of all floors, walls and ceilings bordering the internal volume that is the subject of the pressure test. This includes walls and floors below external ground level. Overall internal dimensions are used to calculate this envelope area and no subtractions are made for the area of the junctions of internal walls, floors and ceilings with exterior walls, floors and ceilings. |
National Calculation Methodology (NCM) modelling guide (for buildings other than dwellings in England) 2013 edition, published by the Department for Communities and Local Government (DCLG), defines ‘envelope area’ as:
|
Area of vertical envelopes (walls) = h * w, where: h = floor to floor height, ie including floor void, ceiling void and floor slab. For top floors, h is the height from floor to the average height of the structural ceiling. w = horizontal dimension of wall. Limits for that horizontal dimension are defined by type of adjacent walls. If the adjacent wall is external, the limit will be the internal side of the adjacent wall. If the adjacent wall is internal, the limit will be half-way through its thickness. NB: Areas of floor, ceilings, and flat roofs are calculated in the same manner as the zone area. Area for an exposed pitched roof (i.e., without an internal horizontal ceiling) will be the inner pitched surface area of the roof. |
Energy Efficiency and Historic Buildings, How to Improve Energy Efficiency, Published by Historic England in 2018, defines the building envelope as:
| The weathertight skin separating the interior of a building from its external environment. It is made up of the roof, walls, windows, doors, floors and foundations; and systems for controlling and disposing of water, including rainwater goods, roof coverings, damp-proof courses and drains). |
[edit] Related articles on Designing Buildings
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.