Clapham One
U+I Group transform areas of towns and cities into thriving communities and neighbourhoods, with a portfolio of mixed- use regeneration projects within London, the south-east, Manchester and Dublin.
In 2012, together with joint venture partners United House, U+I Group delivered a landmark £80m mixed-use regeneration scheme which has transformed leisure services across two sites in Clapham town centre, south west London.
The Public Private Partnership (PPP) scheme provided Clapham with a new highly-sustainable leisure centre, a state-of-the-art library, a family health centre and high-quality residential accommodation, including affordable housing in partnership with Notting Hill Housing Group.
The PPP deal meant that in the depths of the recession, U+I were able to secure £35 million funding for this important project, including loan funding from the Homes and Communities Agency's Kickstart programme, pre-sell £46 million of the development, and guarantee the London Borough of Lambeth a brand new library and leisure centre funded entirely from the sale of the private sector element of the development.
Mary Seacole House on Clapham High Street was replaced by The Library Building, designed by Studio Egret West. The ground floor and basement is based around an audacious spiral design, connecting to the new health centre, a café, performance space and community rooms, reinforcing the community spirit of the development.
The old Clapham Swimming Pool on Clapham Manor Street was replaced with a brand new sustainable leisure centre designed by LA Architects. Facilities include a 6-lane, 25m swimming pool, a much larger fitness suite, a 4-court sports hall, climbing wall and community rooms. The leisure centre opened to the public in December 2011.
Also located on this site is The Manor Building (19 private homes) and 4 Bicycle Mews (44 affordable homes in partnership with Notting Hill Housing Group) both completed in July/August 2011.
Clapham One was awarded Best Mixed-use Development at the International Property Awards 2011 as well as 11 other awards for its architecture, housing design and the quality of its facilities.
Project data:
- Date acquired: 2007
- Date completed: 2012
- Development value: £80 million
- Architect: Studio Egret West, DLA Architecture, LA Architects, ABIR
- Development partners: London Borough of Lambeth
--U and I
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Algarve House, Southwark.
- Articles by U and I.
- Blackhorse Road regeneration.
- Cathedral Group.
- Circus Street, Brighton.
- Cockpit Yard.
- Development Securities.
- Mixed-use development.
- Placemaking.
- Preston Barracks, Brighton.
- Public private partnership.
- Regeneration.
- Skipton House project.
- The Deptford Project.
- The Movement, Greenwich.
- U and I.
- UandI Think event with John McDonnell MP.
[edit] External references
- [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DThenewclapham.com%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|The New]] [[w/index.php?title=W/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DW/index.php%3Ftitle%3DThenewclapham.com%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1%26action%3Dedit%26redlink%3D1&action=edit&redlink=1|Clapham]]
- U and I Plc - Clapham One
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.


























