Worthwhile option
There are currently 24,400 commercial properties sitting empty in London. That’s the equivalent to 15 times the floorspace of Westfield London. 22,500 of those properties have been empty for 6 months or more.
Shocking? Wasteful? Then what about this: there are 2,700 hectares of land in the capital – the equivalent of the London Borough of Lambeth – that have planning permission to build, but construction is yet to start.
That’s a lot of space lying empty in a city that so often feels like it’s bursting at the seams. A city where space is at a premium, where start-ups and independent businesses struggle to get a foothold and where artists struggle to find the space they need to create unless they are willing to locate in remote or substandard facilities.
Think of what could be done with all that empty space with just a little imagination and investment. Those empty spaces could be opened up, brought back to life, and filled by communities, entrepreneurs and artists. Vacant shells could become thriving hubs once again, before a brick has even been laid in the new development.
A new Centre for London report published in October 2018, 'Meanwhile, in London: making use of London’s empty spaces' calls for just that. It finds that opening vacant space up to new uses while they await development – a practice known in the industry as ‘meanwhile use’ – can bring huge benefits and social value to communities. And it calls on the Mayor of London and Government to remove the common hurdles that are preventing this temporary, but worthwhile, use of space from becoming standard practice.
U+I are pleased to have supported this research. It reaffirms our longstanding belief that spaces throughout our cities are not being used to their full potential or adding value to the local community. For years, we have been opening our sites up from the moment we acquire them. We do this in a variety of ways, depending on what the local community most needs.
Over the years, we have incubated the growth of local businesses, start-ups and entrepreneurs, created spaces for artists to flourish, children to learn and for charities to tell their stories. Doing this has helped us to listen to local communities to understand their desires, wants and needs, so we can create spaces that work for the long-term benefit of the community, not just the short-lived. To us it’s not just meanwhile, it’s what we call worthwhile use, because we passionately believe that this is a valuable and essential part of any successful regeneration process.
But all too often, this kind of worthwhile use simply doesn’t happen. As the report shows, people often overestimate the risks and undervalue the benefits of giving over a site to worthwhile use, and planning and licensing systems can make worthwhile projects difficult to undertake. That’s why we support the Centre for London’s recommendations, which include incentivising landowners and businesses to bring empty space back to life, creating open data on commercial vacancies and developing a best practice code between landlords and occupiers to standardise uses. All of these measures will help remove the barriers that stand in the way of using empty space for good.
As developers, we have a choice about what we do with our sites. We can choose to put up hoardings, lock the doors and keep people out, preferring to keep our investments safe and ourselves to ourselves. Or we can choose to pull down the hoardings, throw open the doors and invite people in. We can get to know our neighbours, and in doing so, we can open ourselves up to possibility and work with others to create something far better than we might have managed alone. The latter is the more complicated option, but surely it’s also the most worthwhile.
This article was originally published on 3 Oct 2018 by U+I.
--U and I
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
CIOB Construction Manager of the Year 2025
Just one of the winners at the CIOB Awards 2025.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.