Performance gap between building design and operation
There is significant evidence to suggest that buildings do not perform as well when they are completed as was anticipated when they were being designed. The difference between anticipated and actual performance is known as the performance gap.
Findings from studies such as PROBE (Post Occupancy Review of Buildings and their Engineering) which assessed 23 buildings previously featured as ‘exemplar designs’ in the Building Services Journal between 1995 and 2002, revealed that actual energy consumption in buildings is often twice as much as predicted.
More recent studies have suggested that in-use energy consumption can 5 to 10 times higher than compliance calculations carried out during the design stage:
- The Zero Carbon Hub Closing the gap between design and as-built performance, Evidence review report.
- Innovate UK's Building Performance Evaluation Programme.
- The Carbon Trust‘s Closing the gap, Lessons learned on realising the potential of low carbon building design.
- Carbon Buzz, Performance gap benchmarking data.
Studies such as these suggest that factors contributing to the performance gap include:
- A lack of monitoring and feedback following occupancy, meaning that problems are rarely identified, user behaviour is not corrected and lessons are not learned for future projects.
- Design assumptions do not properly reflect the in-use performance of buildings.
- Designers are rarely required to predict actual in-use energy consumption.
- Calculations for regulatory compliance do not account for all energy uses in buildings. These calculations are commonly misinterpreted as predictions of in-use energy consumption, when in fact they are simply mechanisms for complying with the Building Regulations.
- Unregulated sources of energy consumption such as small power loads, server rooms, external lighting, and so on are rarely considered at the design stage. Yet these typically account for more than 30% of the energy consumption in office buildings.
- The lack of guidance for modelling unregulated energy loads makes it difficult for designers to consider these at design stage.
- There are discrepancies between design specification and the specification and quality of works as-built.
- There are incorrect assumptions about the performance of some building components (such as party walls).
- There are rarely any consequences for designers, contractors and suppliers when energy consumption exceeds predictions.
- Project participants struggle to communicate the intended energy performance for the design from the earliest stages, and have ongoing problems with communicating the design intent throughout detailed design.
- There is poor feedback from site about what is, and what is not buildable.
- Site practices that may have been acceptable 20 years ago, no longer meet the required standards.
- There is an absence of engineering rigour around the design and installation of the services.
NB: In November 2015, BSRIA announced that it would back a four-month feasibility study to develop a prototype UK scheme intended to deliver the standard of energy performance specified in client briefs by adopting a ‘design for performance’ approach, first pioneered in Australia. See BSRIA support study into Australian solution to performance gap for more information.
[edit] Related articles on Designing Buildings
- Achieving sustainable futures with thermal imaging.
- Building data exchange.
- Building performance.
- Building performance evaluation programme.
- Building performance metrics.
- Building regulations.
- BREEAM.
- Closing the gap between design and as-built performance.
- Co-heating test.
- Code for sustainable homes.
- Domestic ventilation systems performance.
- Energy performance certificate.
- Energy Savings Opportunity Scheme.
- Facilities management audit FMA.
- Green building.
- Leadership in Energy and Environmental Design.
- Mind the (performance) gap.
- Performance.
- Performance of exemplar buildings in use: Bridging the performance gap FB 78.
- Performance requirements.
- Quad Central in Malta aims for LEED Platinum certification.
- Retrofit, refurbishment and the growth of connected HVAC technology.
- Soft landings.
- Strategic performance targets.
- The effects of subframe systems on the overall thermal performance of external rainscreen walls.
- The history of non-domestic air tightness testing.
- Thermal imaging to improve energy efficiency in building design.
- Why the UK needs to support emerging tech like energy storage.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.


















Comments
Brilliant article. We made a document that really simply covers what Ventilation refurbishment actually is and why it can be beneficial as opposed to a replacement. Don't feel any pressure, but have a look if you want a really simple updated definition. Click here
https://www.bvs-ltd.co.uk/2023/06/07/refurbish-or-replace-making-the-right-choice-for-your-ahu-unit/