[edit] Introduction
Bars, restaurants and leisure venues are opening. Schools have welcomed back pupils. People are heading back into work. But what, in the building services and ventilation sector, will be our new normal? One thing is already clear - things are going to change.
[edit] New building regulations
We have building regulations revisions imminent that will change the way we design ventilation strategies. The ingress of external pollutants should be minimised. Ductwork should be rigid, not flexible and lengths kept to a minimum.
Approved Document Part F is looking for not just a commissioning report to show the system works adequately, but information in operation and maintenance. The interim uplift for Approved Document Part L is looking for a 27% reduction in carbon emissions per building against the existing standard.
Inevitably, protecting against COVID-19, even despite the vaccination programme, will figure in specifiers’ minds. With the best will in the world, the initial Government guidance to achieve adequate ventilation re COVID-19 of “opening windows” is not practical nor realistic as a long-term strategy alongside the global drive to cut carbon emissions and improve indoor air quality (IAQ).
[edit] System evolution
Whereas on the face of it, the industry is facing a huge amount of change, the wherewithal to deliver is already widely available and in use. Legislation is just confirming what the quality manufacturers and engineers already implement. It all combines to, I believe, an increasing use of standalone ventilation and heat recovery systems, especially those that minimise energy usage.
The latest evolution has been a hybrid-dynamic optimisation of natural ventilation, fan boosted mechanically when required. Ahead of the changes to building regulations, standalone versions have already been developed. Are these the way forward to meet our requirements?
Some hybrid systems, such as units designed to meet current regulatory guidance (eg. BB101 for schools), are standalone single-zone items, which obviates the need for ductwork, either to external or internal areas. No internal penetrations are required either, to move the air through the building, as each unit serves a dedicated zone, whether façade- or ceiling-mounted. This reduces major cost and labour in ductwork, fire dampers and silencers.
The principle therefore already overcomes the potential obstacles when the revised Approved Document F comes into force. They ventilate just the one space, preventing transfer of particulates from one zone to another and thereby minimise risk of internal cross contamination. Some already deliver flow rates compliant with latest COVID-19 guidance (i.e. to achieve a notional carbon dioxide (CO2) below 1000ppm.
CO2 is currently the metric used to check the air is ‘fresh’ within a zone. Links have been established that higher CO2 levels reflect higher COVID-19 risk.
[edit] Modular design
Within modular design products, these can be provided alongside a “mix and match” option of additions. These can be added to meet the specific use and requirements of the buildings to be ventilated.
Some options include:
- Filter modules to address fine airborne particles and maintain the IAQ within required limits.
- Connection modules to address site-specific installation limitations to allow single-sided operation.
- Heating coils that can remove the need for ancillary supplementary heating such as radiators.
- Acoustic attenuation to modulate noise below 30dBA.
- Control unit to enable easy management of the IAQ and temperature to facilitate any over ride as required. This provides capable boost and purge ventilation and night time cooling.
[edit] Get it right
The amount of change, not just in regulations, but how we use our non-domestic buildings in the future, is vast. Specifiers and designers should use the expertise of product manufacturers to their advantage. It is wise to tap this knowledge bank to ensure delivery of the best, most compliant solution for the project.
This article originally appeared on the BSRIA Blog. It was written by BSRIA member Roy Jones, Technical Director at Gilberts (Blackpool) Ltd. and published on 5 October 2021.
--BSRIA
[edit] Related articles on Designing Buildings
- Air tightness.
- Approved documents.
- Approved Document F.
- Approved document L.
- Back to the workplace: are you prepared?
- BSRIA articles on Designing Buildings Wiki.
- Building Regulations.
- Building ventilation and COVID-19 transmission risk.
- IAQ developments accelerated by COVID-19.
- Indoor air quality.
- Single-sided ventilation.
- Ventilation.
- Ventilation and control of COVID-19 transmission.
Featured articles and news
We're expanding our collaborative mission by launching DB Intelligence, an exclusive market research advisory panel. Built environment professionals can now get paid to share their expertise on industry trends, products and services.
Panel members receive direct financial incentives for participating in research projects like short surveys, 1-2-1 interviews and focus groups. Register today to shape the future of the construction sector.
Planning condition discharge in England and Wales
A brief exoplanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.