SHED concept
In July 2017, the SHED concept was unveiled by design team Studio Bark and Lowe Guardians, a property management company. The radical new concept is intended to provide an alternative to central London’s high rental rates for young people. It also seeks to reassess vacant space and how it can provide a sustainable approach to affordable living in city centres.
Lowe Guardians offer property guardianship options for young professionals and low-cost security solutions for property owners. They have teamed up with Studio Bark, an architectural practice that delivers cost-conscious environmental architecture. Studio Bark first came into the public eye when their sustainable, private home ‘Periscope House’ was featured on Channel 4’s Grand Designs.
The SHED concept comprises a modular building system that can be constructed in a day within an otherwise abandoned property, creating a high-quality, affordable accommodation unit. Each SHED is constructed from lamb’s wool insulation, oriented strand board (OSB) and recycled polyester. It also takes a day to dismantle a SHED, which can then be rebuilt on another premises
The SHEDs come in varying sizes but start at around 120 sq ft. As a flexible solution for the short term, the SHED provides an environmentally-friendly, self-contained solution which can be decorated or changed by the occupying Guardians.
Research conducted by Lowe Guardians found that there are currently 600,000 empty properties across the UK that could be used for temporary residency using the new SHED solution. This includes thousands of prime sites in central London.
Tim Lowe, Director, Lowe Guardians, said:
“The vacant buildings we assess can vary hugely in both condition and function. Sometimes the sheer or size or layout of properties means we are unable to take them on. Derelict warehouses remain a huge, untapped potential for us that could benefit Guardians and property owners alike.
“However, the reality is that turning vast, open spaces into private rooms for Guardians has always been both tricky and time consuming. Our aim is to help London professionals and keyworkers as much as we can and this means taking on larger vacant buildings that offer huge potential for providing quality accommodation.
“The SHED concept provides a safe, sustainable alternative for workers seeking short-term accommodation. In every site we occupy, we fit the spaces out to a habitable standard but this has historically created a considerable amount of waste; both financially and environmentally. We were looking for a solution which allowed us to much more creative with the space, and take everything with us when we went onto the next site.”
Content and images courtesy of Studio Bark.
Photographs © David Jensen. Interior design by Anna Glover.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Some of the articles relating to water, here to browse. Any missing?
Recognisable characters of Gothic architecture designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.


























