Post-completion insurance
Post-completion insurance (more usually known as latent defects insurance) provides cover for latent defects. These are failures in design, workmanship or materials that may not become apparent until many years after practical completion of the project and long after the end of the defects’ liability period.
This form of insurance provides cover for new building work or for work on existing buildings. It is seen as providing more complete cover for defects than other methods (such as collateral warranties) which may require proof of breach of contract. Any party with an interest in the property (eg owner or developer) can be the insured (policy holder), but it can also be the funder or an incoming tenant who has repair obligations under a lease.
Available for a period of between 8-12 years from the date of final certificate or practical completion, post-completion insurance typically covers defects in the structure and weatherproof envelope of the building – but no other defects.
Whether an insurer decides to provide cover will depend on whether they are confident and satisfied regarding the original construction. However, when cover is provided, it usually involves significant premiums. For example, in the case of a contract works value of £2,500,000, a latent defects policy could cost around £25,000 to £30,000; when bearing in mind the excess is normally 1%, ie £25,000 of the sum insured, the first £50,000 (in this example) of any claim will have to be met by the insured.
[edit] Related articles on Designing Buildings Wiki
- Building Users' Insurance Against Latent Defects.
- Collateral warranties.
- Contractors' all-risk insurance.
- Contract works insurance.
- Decennial liability.
- Design liability.
- Directors and officers insurance.
- Employer's liability insurance.
- Excepted risk.
- Flood insurance.
- Future of construction insurance.
- Indemnity to principals.
- Integrated project insurance.
- JCT Clause 6.5.1 Insurance.
- Joint names policy.
- Latent defects insurance.
- Legal indemnities.
- Legal indemnity insurance.
- Non-negligent liability insurance.
- Performance bond.
- Professional Indemnity Insurance.
- Public liability insurance.
- Residual value insurance.
- Reverse premium.
- Specified perils.
- Subcontractor default insurance (SDI).
- Warranty.
Featured articles and news
50th Golden anniversary ECA Edmundson apprentice award
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.
Mental health awareness week 13-18 May
The theme is communities, they can provide a sense of belonging, safety, support in hard times, and a sense purpose.
Mental health support on the rise but workers still struggling
CIOB Understanding Mental Health in the Built Environment 2025 shows.
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
Construction contract awards down one billion pounds
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.