Loyly, Finland
Designed by Avanto Architects, Löyly is a coastal sauna located in Hernesaari, a former industrial area of Helsinki, Finland. It was completed in 2016.
The building is characterised by an irregularly-shaped outer shell that acts as a ‘cloak’, covering the rectangular black box that contains the sauna and restaurant.
Wooden slats and bleachers create the multi-faceted volume of the sauna, allowing visitors to climb up to a viewing platform. The building is relatively low to the ground so that it will not impinge upon sea views for future residents. At ground level, a terrace extends out over the coastline, with a flight of stairs leading down into the sea.
The building is made of blackened concrete and steel and pale Scandinavian birch wood, materials selected for their durability. The external pine cladding was pressed, glued and heat-treated, and is intended to grey with age so that it blends in with the stony coastline.
The developers intend to rediscover the community attachment to public saunas, which have been under threat from the growing popularity of private saunas. Finland, with a population of 5.4 million, has over three million saunas, roughly one per household.
[edit] Related articles on Designing Buildings Wiki
- Blur Building.
- Building of the week series.
- Chapel of the Holy Cross, Sedona.
- Cube Houses.
- Dancing House, Prague.
- Fish Building, India.
- Gentle Genius.
- Liepaja Thermal Bath.
- Little Crooked House, Poland.
- Norwegian Mountaineering Center.
- Suvela Chapel.
- Swimming pool construction.
- Underwater restaurant.
- Unusual building design of the week.
Featured articles and news
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
























