[edit] Introduction
A study from the UCL(1) revealed that building failures may cost the UK construction industry £1bn to £2bn every year. This was a conservative estimate made in 2016, based on 1 to 2% of the total value of construction.
As of March 2020, the Office for National Statistics has estimated the total value of all UK construction works to be worth £12.7bn, 68% of which is for new buildings or the repair and maintenance of existing buildings. This would give an estimated cost of failure between £85m and £170m, of which building services would account for a high proportion.
[edit] Types of failures in building services
Diagram courtesy of BSRIA; not for reuse.
The typical pattern of failure arising against time is shown by the well-known bathtub curve, which is divided into three segments or periods.
The first period is usually detected during the defects liability period after a project is handed over.
The second period would happen during the operation of a system, and failures may occur due to inappropriate operating conditions or maintenance regimes.
The third period is when the system is reaching the end of its life. Failure could be imminent and there should be little or no surprise in this happening.
[edit] Importance of investigating these failures
There are various reasons why every unexpected failure should be investigated. Below are some of the key ones:
- Insurance purposes. Insurers may require an independent evaluation of the failure and investigation of its possible cause to identify possible fraudulent or malicious intentions.
- Cost savings. Too often, failed components are replaced without investigating the root cause. Without understanding the origin of a failure, it is not possible to prevent its re-occurrence. Repetitive failure and replacement of components could add significantly to the operating cost for a building or estate.
- Health and safety. In May 2009, a lift at London’s Tower Bridge tourist attraction suffered a vital mechanism failure that sent it falling with nine people in it, four of whom suffered bone fractures. The malfunction was caused by the failure of a counterweight mechanism. The accident investigation by the HSE revealed that there had been several previous component failures with the counterweight mechanism, and the components had been replaced without proper review, and with no investigation into why they were failing so early. Tower Bridge was ordered to pay a total cost of £100k, and the HSE concluded that, had there been a proper review into the counterweight mechanisms, the catastrophic failure of the lift could have been avoided.
Read more about BSRIA’s Failure Investigation service here.
(1) Razak, D S A, Mills, G and Roberts, A (2016) External Failure Cost in Construction Supply Chains. In: P W Chan and C J Neilson (Eds.)
This article was originally published as The importance of investigating failures in building services on the BSRIA website on 20 May 2020. It was written by Martin Ronceray, BSRIA Engineering Investigation Lead.
--BSRIA
[edit] Related articles on Designing Buildings Wiki
- BSRIA articles on Designing Buildings Wiki.
- Cracking and building movement.
- Defects.
- Failure.
- Failure modes and effect analysis (FMEA).
- Inspection and test plan.
- Latent defects.
- Structural failures.
- Why should quality be important to the construction industry/
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.