Google King's Cross campus
On 1 June 2017, Google submitted an application for planning permission to Camden council for its proposed King’s Cross Campus. This building will be the first, wholly-owned and designed Google building outside the United States.
Construction of the purpose-built 11-storey 'groundscraper' building, providing 1 million sq. ft, of accommodation will commence in 2018. The building will be longer than The Shard is tall.
Designed by Heatherwick Studio and Bjarke Ingels Group (BIG), the building will feature a natural theme, with all materials sourced through Google’s healthy materials programme. The new building, combined with the current building at 6 Pancras Square and an additional third building, will create a Google campus with the potential to house 7,000 employees.
Joe Borrett, Director of Real Estate & Construction, said:
“We are excited to be able to bring our London Googlers together in one campus, with a new purpose-built building that we’ve developed from the ground up. Our offices and facilities play a key part in shaping the Google culture, which is one of the reasons we are known for being amongst the best places to work in the industry.”
Thomas Heatherwick, Founder of Heatherwick Studio, who jointly designed the new building, said:
“As my home and the home of my studio for more than 15 years, I have a close relationship with King’s Cross. The area is a fascinating collision of diverse building types and spaces and I can't help but love this mix of massive railway stations, roads, canals and other infrastructure all layered up into the most connected point in London.
“Influenced by these surroundings, we have treated this new building for Google like a piece of infrastructure too, made from a family of interchangeable elements which ensure that the building and its workspace will stay flexible for years to come”.
Bjarke Ingels, Founding Partner at Bjarke Ingels Group, joint architect of Google’s new building, noted:
“Our design for the new Google Campus at King’s Cross is rooted in the local character of the area, taking advantage of the contextually defined building envelope while creating continuously cascading work environments that will connect Googlers across multiple floors. By opening up the ground floor and activating the roofscape, the light and airy workspaces are sandwiched between the terraced gardens on the roof - and market halls, auditoria and shops on the ground.”
Roly Keating, Chair of the Knowledge Quarter said:
“Google have supported the Knowledge Quarter vision from the beginning and it will be a pleasure to welcome them into their new headquarters building at the heart of the neighbourhood. The arrival of thousands of Googlers mixing with scientists, archivists, academics and students will accelerate the incredible breadth of innovation taking place in this unique part of London. We are delighted to see plans taking shape which will strengthen the Knowledge Quarter as a world-class centre for research and creativity.”
Content and images courtesy of Google.
The appliction recieved planning permission in August 2017, and it was reported that main contractor Lendlease would start on site in 2018.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.