Flexible working in engineering services
Construction and engineering services, like other front-line sectors, have been slow to integrate working arrangements that give a degree of flexibility on how long, where, when and at what times employees work.
There are several barriers to this slow take-up of flexible working, from the interdependency of roles to the fragmentation of the workforce between different tiers. These mean that flexible working has been considered almost a taboo subject. However, a 2021 pilot study provides much needed insight into how to look beyond these barriers to realise the rewards of flexible working.
The reasons for industry to begin to progress a more flexible approach are persuasive, including addressing the skills shortage through attracting and retaining a more diverse workforce. The report identifies the under-representation of women and the attractiveness of flexible working to women, given that they are more likely to have caring responsibilities.
The study also highlights broader concerns – applicable to everyone, regardless of gender – about work-life balance, the long hours culture and the need to address wellbeing and worrying suicide rates. Whilst flexible working is not presented as the panacea to all industry woes, it offers the opportunity, as part of a workforce strategy, to begin to address these concerns.
The pilot study, which was commissioned by Build UK, involved four large main contractors: BAM Construct; BAM Nuttall; Skanska UK; and Willmott Dixon. Each introduced tailored flexible working practices onto different project sites, ranging in size between 14 and 120 employees.
The specific practices trialled in this way included:
- A team-based consultative approach, allowing workers to submit preferences for working patterns that met planned and defined business needs.
- A flexi-day in which workers could accumulate additional hours in exchange for one day off each month.
- An output-based approach which meant that workers could leave once their work for the day was completed rather than remain on site to complete their contracted hours.
- Staggered start and finish times whereby the foreman alternated start times between two teams coupled with a choice of break time.
The reported results were encouraging.
Feedback from participants showed a significant increase in wellbeing from 43% to 84%. Qualitative feedback from managers highlighted a greater sense of trust and empowerment. All four firms reported no impact on budgets or timeframes.
The report – entitled Making Construction a great place to work: Can flexible working help? – provides useful guidance on the need for a controlled and measured approach to the implementation of flexible working. This starts with a vision and buy-in at the top. The report also recommends a trial run before any wider roll-out, plus clear criteria for measuring outcomes.
Finally, the report highlights the need to review management capability and address any training needs this identifies.
Timewise have compiled a 10-step plan to incorporate these learning points which can be found here.
The Timewise pilots attempted to break the taboo of flexible working for site-based staff. In carefully selected, small-scale projects this now looks practicable. This is a small step for industry to begin to embrace the flexible working challenge and to expand provision for inclusive flexible working practices for all staff.
If you have any questions on introducing flexible working, please contact the ECA Employee Relations Advisory Service at [email protected] or 020 7313 4800.
This article originally appeared on the ECA website under the headline, 'Breaking the Taboo: Flexible working in Engineering Services'. It was written by Catherine Watt, Head of Employee Relations, and published on 27 July 2021.
--ECA
[edit] Related articles on Designing Buildings Wiki
- Articles by the Electrical Contractors' Association (ECA).
- A 10 point plan to overcome the construction and infrastructure skills gap.
- Balance for better: why lack of diversity is an issue for everyone.
- Diversity in the construction industry.
- Post pandemic places report.
- Skills shortage.
- Tackling the construction skills shortage.
- Women in the construction industry.
- Work from home trends influence closed plan home preferences.
[edit] External resources
Featured articles and news
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description fron the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.