First aider
Contents |
[edit] Introduction
A first aider is a person that has undertaken necessary first aid training and holds a valid qualification as proof of competence. First aiders are important on construction sites as they can provide help and assistance should there be an injury or illness.
Common injuries that first aiders may have to deal with on site include:
- Electric shock.
- Falls from height.
- Injuries from building materials, plant and equipment.
[edit] Qualifications
The qualification must be one that the Health & Safety Executive (HSE) recognise. This can be either:
- First aid at work (FAW), a higher level 3-day course which also covers first aid to specific injuries and illnesses.
- Emergency first aid at work (EFAW): Usually a one-day course covering emergency first aid.
First aiders should take one or both courses from a training organisation that is approved by HSE or a recognised awarding body of Ofqual/Scottish Qualifications Authority. It is recommended that first aiders undertake annual refresher training to ensure their basic skills are up to date. Certificates last for three years, and before expiring a requalification course should be undertaken by the first aider.
[edit] Number of first aiders
Although there are no exact rules or requirements on the number of first aiders for a construction site, the Health and Safety (First Aid) Regulations 1981 require all construction sites to have:
- A first aid box with the necessary equipment for the number of on-site workers.
- Clear information provided, usually in the site facilities, giving the name of the appointed person or first aider and where to find them.
- An appointed person responsible for first aid arrangements.
Since there are no specific requirements, each construction project should be assessed on the basis of its first aid needs. This will be influenced by the number of operatives on site, the type of working conditions, the type of materials being used, and the construction procedures being undertaken.
The HSE provides guidance on the number of first aiders:
- Less than 5 people on site: At least one appointed person.
- 5-50 people on site: At least one qualified first aider trained in EFAW or FAW.
- More than 50 people on site: At least one first aider trained in FAW per 50 operatives.
First aid personnel should be available at any time that work is being done on site. If work is being done in shifts, then a project may need two qualified first aiders to handle the separate shift work.
[edit] Appointed person
The appointed person is responsible for first aid facilities, equipment, and procedures, although unlike first aiders they do not require first aid training. The appointed person is also responsible for calling the emergency services when required.
[edit] First aid kit
As a minimum, a site first aid kit should contain:
- A leaflet giving general guidance on first aid.
- Sterile plasters (assorted sizes) appropriate to the type of work.
- Sterile eye pads.
- Triangular bandages.
- Safety pins.
- Sterile unmedicated wound dressings.
- Disposable gloves.
Although there is no specific timeframe, many items, particularly sterile items, have expiry dates and should be disposed of and replaced accordingly.
British Standard BS 8599 provides further information on the contents of first aid kits.
[edit] Related articles on Designing Buildings
- Accident book.
- Automated external defibrillator AED.
- Building a Safe Workspace: Your Complete Guide to Preparing First Aid in the Workplace.
- Building Site to Boardroom (BS2B).
- Competent person.
- Construction dust.
- Construction work in hot weather.
- Health and safety.
- Deleterious materials.
- Emergency services.
- Empowering the Construction Industry to take Action on Mental Health.
- Environmental health.
- Health and safety at work etc act 1974.
- Health and safety consultant.
- Health and Safety Executive.
- Health and safety file.
- Health and safety inspector.
- Health and safety policy.
- Near miss.
- Notification to HSE.
- Personal protective equipment PPE.
- Reporting accidents and injuries on construction sites.
- Risk of rats in construction.
- Site safety.
- Work at height regulations.
- Workplace safety supplies.
[edit] External references
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.