First aider
Contents |
[edit] Introduction
A first aider is a person that has undertaken necessary first aid training and holds a valid qualification as proof of competence. First aiders are important on construction sites as they can provide help and assistance should there be an injury or illness.
Common injuries that first aiders may have to deal with on site include:
- Electric shock.
- Falls from height.
- Injuries from building materials, plant and equipment.
[edit] Qualifications
The qualification must be one that the Health & Safety Executive (HSE) recognise. This can be either:
- First aid at work (FAW), a higher level 3-day course which also covers first aid to specific injuries and illnesses.
- Emergency first aid at work (EFAW): Usually a one-day course covering emergency first aid.
First aiders should take one or both courses from a training organisation that is approved by HSE or a recognised awarding body of Ofqual/Scottish Qualifications Authority. It is recommended that first aiders undertake annual refresher training to ensure their basic skills are up to date. Certificates last for three years, and before expiring a requalification course should be undertaken by the first aider.
[edit] Number of first aiders
Although there are no exact rules or requirements on the number of first aiders for a construction site, the Health and Safety (First Aid) Regulations 1981 require all construction sites to have:
- A first aid box with the necessary equipment for the number of on-site workers.
- Clear information provided, usually in the site facilities, giving the name of the appointed person or first aider and where to find them.
- An appointed person responsible for first aid arrangements.
Since there are no specific requirements, each construction project should be assessed on the basis of its first aid needs. This will be influenced by the number of operatives on site, the type of working conditions, the type of materials being used, and the construction procedures being undertaken.
The HSE provides guidance on the number of first aiders:
- Less than 5 people on site: At least one appointed person.
- 5-50 people on site: At least one qualified first aider trained in EFAW or FAW.
- More than 50 people on site: At least one first aider trained in FAW per 50 operatives.
First aid personnel should be available at any time that work is being done on site. If work is being done in shifts, then a project may need two qualified first aiders to handle the separate shift work.
[edit] Appointed person
The appointed person is responsible for first aid facilities, equipment, and procedures, although unlike first aiders they do not require first aid training. The appointed person is also responsible for calling the emergency services when required.
[edit] First aid kit
As a minimum, a site first aid kit should contain:
- A leaflet giving general guidance on first aid.
- Sterile plasters (assorted sizes) appropriate to the type of work.
- Sterile eye pads.
- Triangular bandages.
- Safety pins.
- Sterile unmedicated wound dressings.
- Disposable gloves.
Although there is no specific timeframe, many items, particularly sterile items, have expiry dates and should be disposed of and replaced accordingly.
British Standard BS 8599 provides further information on the contents of first aid kits.
[edit] Related articles on Designing Buildings
- Accident book.
- Automated external defibrillator AED.
- Building a Safe Workspace: Your Complete Guide to Preparing First Aid in the Workplace.
- Building Site to Boardroom (BS2B).
- Competent person.
- Construction dust.
- Construction work in hot weather.
- Health and safety.
- Deleterious materials.
- Emergency services.
- Empowering the Construction Industry to take Action on Mental Health.
- Environmental health.
- Health and safety at work etc act 1974.
- Health and safety consultant.
- Health and Safety Executive.
- Health and safety file.
- Health and safety inspector.
- Health and safety policy.
- Near miss.
- Notification to HSE.
- Personal protective equipment PPE.
- Reporting accidents and injuries on construction sites.
- Risk of rats in construction.
- Site safety.
- Work at height regulations.
- Workplace safety supplies.
[edit] External references
Featured articles and news
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.