Computer aided facilities management CAFM
Contents |
[edit] Introduction
Computer aided facilities management software assists facilities managers with planning, managing, reporting and tracking facilities operations. It is usually is a mixture of Computer Aided Design (CAD) and/or specific facilities management relational database software.
Facilities management software tools were first developed in the late 1980s and became popular in a variety of sectors including; healthcare, government, education, commercial organisations and industry. Many computer aided facilities management (CAFM) software solutions are now web-based and offer a wide variety of features including facilities orientated scheduling and analysis techniques.
Computer aided facilities management systems can:
- Help facilities managers ensure organisation’s assets are fully utilised at the lowest cost, through all stages of a building’s life cycle.
- Support the operational and strategic parts of facilities management including technical, administrative and infrastructure tasks and the strategic processes required for planning and management.
[edit] Capabilities
Computer aided facilities management systems will include a variety of functions and features which can be tailored to the exact requirements of the organisation. This might include:
- Strategic planning: Systems can assist in determining space requirements, equipment layouts, construction costs, environmental constraints, and other critical planning functions.
- Space inventory and organisation: Space attributes and elements can be defined and standardised and asset inventories prepared including; floor plans, locations, dimensions, cost, usage, energy consumption, age, construction data, important contact details, key pieces of equipment and essential infrastructure, fire and safety properties and so on.
- Operations: Building services can be monitored and managed.
- Maintenance and repairs: Routine repairs and preventive maintenance operations can be scheduled and monitored.
- Forecasting: It is possible to predict future requirements for space, utilities, equipment and so on, and to cost and plan changes.
[edit] Integrated computer aided facilities management systems
Integrated CAFM systems have intelligent interfaces, along with advanced functionalities and links to analysis packages. Features common to most integrated CAFM systems include:
- Interactive databases: Relational databases that focus on the functional requirements of facility managers.
- Interactive graphics: Allowing for basic alterations to layouts, plans or other visual documents with most having standard CAD engines.
- Data management tools: It is possible for systems to use existing data and to export useful information.
Increasingly, CAFM systems include or are linked to building information models (or asset information models). BIM can provide a fully-populated asset data set to feed into CAFM systems and modelling to enable planning modifications. This data need to be maintained throughout the building lifecycle.
The introduction of Project & Life Cycle Management Systems should ensure that existing CAFM systems do not become redundant but rather that facilities managers benefit from:
- Early project engagement.
- Making their contribution towards materials and products used, rather than allowing procurement to make that decision.
- Enhanced asset intelligence through the use of integrated Product Information Portals.
- Smarter assets.
- Cross fertilisation of information across disciplines.
- A single version of the ‘truth’.
- Starting to understand the performance of the project pre-handover.
- Understanding the intended operation of the project for maximum efficiency.
- Integrated links to existing CAFM and external systems.
NB Smart Building Overlay to the RIBA Plan of Work, published by the RIBA in 2024, states: ‘CAFM software enables asset management teams to plan, execute and monitor all activities involved in reactive and planned preventative maintenance, space and move management, asset management, operational facility services, room reservations and other customer service.’
[edit] Related articles on Designing Buildings
- Asset information requirements.
- Asset management.
- BIM and facilities management.
- Computerised managed maintenance system CMMS.
- Creating an asset register for construction projects.
- Employer’s information requirements.
- Enterprise asset management.
- Facilities management.
- Facility Management Technology
- FM Navigate
- Geographic information systems.
- Institute of Workplace and Facilities Management IWFM.
- PAS 1192-3 Specification for information management for the operational phase of construction projects using building information modelling.
- Soft landings.
- Software as a Service SaaS.
- Sustainability in Facility Management
- Work order management system.
Featured articles and news
A case study and a warning to would-be developers
Creating four dwellings for people to come home to... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.
Futurebuild and UK Construction Week London Unite
Creating the UK’s Built Environment Super Event and over 25 other key partnerships.
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
























