Computer aided facilities management CAFM
Contents |
[edit] Introduction
Computer aided facilities management software assists facilities managers with planning, managing, reporting and tracking facilities operations. It is usually is a mixture of Computer Aided Design (CAD) and/or specific facilities management relational database software.
Facilities management software tools were first developed in the late 1980s and became popular in a variety of sectors including; healthcare, government, education, commercial organisations and industry. Many computer aided facilities management (CAFM) software solutions are now web-based and offer a wide variety of features including facilities orientated scheduling and analysis techniques.
Computer aided facilities management systems can:
- Help facilities managers ensure organisation’s assets are fully utilised at the lowest cost, through all stages of a building’s life cycle.
- Support the operational and strategic parts of facilities management including technical, administrative and infrastructure tasks and the strategic processes required for planning and management.
[edit] Capabilities
Computer aided facilities management systems will include a variety of functions and features which can be tailored to the exact requirements of the organisation. This might include:
- Strategic planning: Systems can assist in determining space requirements, equipment layouts, construction costs, environmental constraints, and other critical planning functions.
- Space inventory and organisation: Space attributes and elements can be defined and standardised and asset inventories prepared including; floor plans, locations, dimensions, cost, usage, energy consumption, age, construction data, important contact details, key pieces of equipment and essential infrastructure, fire and safety properties and so on.
- Operations: Building services can be monitored and managed.
- Maintenance and repairs: Routine repairs and preventive maintenance operations can be scheduled and monitored.
- Forecasting: It is possible to predict future requirements for space, utilities, equipment and so on, and to cost and plan changes.
[edit] Integrated computer aided facilities management systems
Integrated CAFM systems have intelligent interfaces, along with advanced functionalities and links to analysis packages. Features common to most integrated CAFM systems include:
- Interactive databases: Relational databases that focus on the functional requirements of facility managers.
- Interactive graphics: Allowing for basic alterations to layouts, plans or other visual documents with most having standard CAD engines.
- Data management tools: It is possible for systems to use existing data and to export useful information.
Increasingly, CAFM systems include or are linked to building information models (or asset information models). BIM can provide a fully-populated asset data set to feed into CAFM systems and modelling to enable planning modifications. This data need to be maintained throughout the building lifecycle.
The introduction of Project & Life Cycle Management Systems should ensure that existing CAFM systems do not become redundant but rather that facilities managers benefit from:
- Early project engagement.
- Making their contribution towards materials and products used, rather than allowing procurement to make that decision.
- Enhanced asset intelligence through the use of integrated Product Information Portals.
- Smarter assets.
- Cross fertilisation of information across disciplines.
- A single version of the ‘truth’.
- Starting to understand the performance of the project pre-handover.
- Understanding the intended operation of the project for maximum efficiency.
- Integrated links to existing CAFM and external systems.
NB Smart Building Overlay to the RIBA Plan of Work, published by the RIBA in 2024, states: ‘CAFM software enables asset management teams to plan, execute and monitor all activities involved in reactive and planned preventative maintenance, space and move management, asset management, operational facility services, room reservations and other customer service.’
[edit] Related articles on Designing Buildings
- Asset information requirements.
- Asset management.
- BIM and facilities management.
- Computerised managed maintenance system CMMS.
- Creating an asset register for construction projects.
- Employer’s information requirements.
- Enterprise asset management.
- Facilities management.
- Facility Management Technology
- FM Navigate
- Geographic information systems.
- Institute of Workplace and Facilities Management IWFM.
- PAS 1192-3 Specification for information management for the operational phase of construction projects using building information modelling.
- Soft landings.
- Software as a Service SaaS.
- Sustainability in Facility Management
- Work order management system.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
























