Engineering services bodies issue coronavirus site safety guides
In May 2020, Engineering services sector bodies ECA and BESA jointly published two guides to help contractors manage coronavirus-related issues on site.
The new guides are freely available to the wider industry during the emergency. They provide sector-relevant guidance for engineering and building services contractors working across construction and FM in two specific areas:
- ‘Specific Environments’ (where there may be higher risk of COVID-19 transmission).
- ‘Close proximity working’ (less than 2m).
The guides:
- Align with the hierarchy of preventive measures shown in the Construction Leadership Council (CLC) Site Operating Procedures (SOP), based on guidance from Public Health England.
- Do not recommend the deployment of respiratory protective equipment (RPE) for general site activities, most notably where social distancing is possible.
- Recommend that any decision to deploy RPE in site-specific situations should be based on risk assessment.
The guides have been drawn up with the support of a COVID-19 Expert Panel made up of BESA and ECA safety practitioners. The panel is also helping ECA and BESA provide informed, practical comments on site health and safety issues to the government and industry bodies that are generating overarching guidance in this area.
BESA Health & Safety Advisor Rebecca Crosland said: “It is imperative that there is further guidance out there to help keep the industry safe. The health, wellbeing and safety of everyone on site must be a priority during the COVID-19 health crisis. Businesses must exercise their duty of care under legislation to ensure all workers are protected and ensure that any critical information related to their health and safety is communicated clearly and then implemented.”
Paul Reeve, ECA’s CSR Director and a member of the CLC’s working group on site safety measures said: “The CLC SOP is an overarching industry document, but it refers to the need for sector guidance. These two guides are the start of joint ECA and BESA activity to produce more detailed, sector-relevant information that’s desperately needed by many engineering services contractors. They aim to help with the practical management of coronavirus-related issues on site, which may include the challenges associated with doing essential work in closer proximity than 2 metres.”
ECA has a freely available coronavirus industry hub, with an array of updates and guidance, available at http://www.eca.co.uk/coronavirus.
This article was originally published on the ECA website on 1 May 2020.
--ECA
[edit] Related articles on Designing Buildings Wiki
- Articles by the Electrical Contractors' Association (ECA)
- BESA - the Building Engineering Services Association
- Beyond the pandemic.
- CICV creates COVID toolkit.
- CLC releases Site Operating Procedures v6.
- Construction dust.
- Construction sites urged to integrate test and trace.
- Coronavirus
- Covid 19 and the new normal for infrastructure systems.
- England housing market resumes post-coronavirus operations.
- Face coverings and a shifting policy background.
- Personal protective equipment PPE.
- Plan proposes to reinvent construction industry.
- Re-starting construction in a COVID-19 environment.
- Site safety.
- Social distancing compliance marshal.
- The future of the coronavirus furlough.
Featured articles and news
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.