Contractor's proposals for building design and construction
The phrase 'contractor's proposals' (CP) generally refers to documentation prepared by tenderers for design and build projects or on a traditional contract where the tenderer is to design discrete parts of the works. They are prepared in response to employer's requirements which provide a description of the client's requirements, including the specification for the building, the scope of services required and an allocation of risk for unknown items.
The contractor's proposals set out their proposals for designing and constructing the project, along with their price.
The level of detail in the employer's requirements and the extent of design required from the tenderer is variable. Employers requirements can range from a very simple specification to a fully developed performance specification and concept design.
The procurement process may follow either a single-stage or two-stage processes. A single-stage tender process is suitable where the information presented in the employer's requirements is sufficiently well developed for the tenderer to be able to calculate a realistic price. This can be the case either if a concept design has already been prepared by consultants working for the client, or if the building is very straight-forward, in which case much of the design work might be carried out by the tenderer during the tender process.
A two-stage tender process is suitable where the employer's requirements are not sufficiently well developed for the tenderer to be able to calculate a realistic price. In this case, the tender may include a fee for designing the building along with a schedule of rates that can be used to establish the construction price for the second-stage tender.
The format and content of contractor's proposals should be as described in the employer's requirement's, but they might include:
- Design drawings or a building information model.
- Specifications.
- Schedules.
- Method statements.
- A BIM execution plan if building information modelling is being used.
- A programme.
- The tender price and contract sum analysis.
- Details of inconsistencies between the contractor's proposals and the employer's requirements.
- Any proposed provisional sums.
- Proposed sub-contractors (the contractor may only sub-contract parts of the works with the consent of the client, although this consent cannot be unreasonably withheld).
- Details of insurances.
- Curriculum vitae of staff along with a summary of their relevant experience on similar projects.
- An initial construction phase plan.
Once the client has received the contractor's proposals, there is likely to be period of negotiation during which any inconsistencies between the contractor's proposals and the employer's requirements are discussed and either the contractor's proposals or the employer's requirements are amended to ensure agreement between them. This is a very important part of the tender process as it is not always entirely clear which document prevails after the contract has been entered into.
NB The RIBA Plan of Work 2013 defines the contractor's proposals as: 'Proposals presented by a contractor to the client in response to a tender that includes the Employer’s Requirements. The Contractor’s Proposals may match the Employer’s Requirements, although certain aspects may be varied based on value engineered solutions and additional information may be submitted to clarify what is included in the tender. The Contractor’s Proposals form an integral component of the Building Contract documentation.'
[edit] Related articles on Designing Buildings
- BIM execution plan.
- Construction phase plan.
- Contract sum analysis.
- Contractor.
- Design and build.
- Design Build Finance Transfer (DBFT).
- Employer's agent.
- Employer's information requirements.
- Employer's requirements.
- Method statement.
- Novation.
- Procurement route.
- Programme.
- Proposals.
- Provisional sum.
- Specification.
- Supply chain capability summary (BIM).
- Tender.
- Two stage tender.
Featured articles and news
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Comments