Acoustic louvre
Contents |
[edit] Introduction
Heat build-up in building services plant is a serious concern when it comes to design. So much so that it is essential to consider it in relation to many factors, including soundproofing. A louvre can help to ease these problems, as well as providing air flow which allows for an enhanced soundproofing solution.
Acoustic louvres can be used in circumstances where air flow is required, but the potential noise breakout from a conventional opening, or louvred opening would be unacceptable.
[edit] Small applications
Size and design can sometimes affect the ability to have a full louvre compound in a space. In this case, a smaller application can be installed to create the same effect on a much smaller level. A screen is just as beneficial for relieving heat build up as well as reducing noise as a full compound is.
The benefits of a small louvre application include:
- Noise reduction.
- Optimal airflow design.
- They can be made into small screens to fit any size room or plant deck.
- They can be designed to any size.
[edit] Louvre compound
A full compound helps to more efficiently block sound and prevents a build-up of heat, as airflow is able to fully surround the plant in the room.
The benefits of a full compound include:
- Full surround airflow prevents a build-up of heat.
- A significant reduction in noise levels.
[edit] Louvre details
Enclosures are made up of acoustic panels as well as supporting steelwork. The panels are made up of sheet steel which is then galvanised, as well as filled with wool for extra sound insulation. There are a number of finishes available for any size louvre. Mitred corners can be included in the design for specialist circumstances.
--Airmatic Ltd 08:58, 20 Oct 2017 (BST)
[edit] Related articles on Designing Buildings
Featured articles and news
Building Control Independent Panel final report
A precis of a key report lead by Dame Hackitt with full recomendations and link to the government response.
Guide to ISO 19650 for Architecture Firms (2026)
A user gives their low down.
A UK training and membership provider for mould remediation professionals.
Building Safety recap April, 2026
A short and longer run-through of the month, with links to further information and sources.
CIAT May 2026 briefing.
Independent NSI and BAFE study exploring how organisations are changing the way they buy fire safety services.
From medieval scribes to modern word art.
ECA welcomes crackdown on late payment and push for clean energy, whilst CIOB seek fixed cladding removal timeframes.
Cyber Security in the Built Environment
Protecting projects, data, and digital assets: A CIOB Academy TIS.
Managing competence in the built environment
ITFG publishes new industry guide on how to meet the ICC principles.
The UK's campaign to reduce noise pollution: Mythbusting, articles and topic guides.
Setting Expectations on Competence Management
Industry Competence Committee.
New Scottish and Welsh governments
CIOB stresses importance of construction after new parliament elections.
The sad story of Derby Hippodrome
An historic building left to decay.
ECA, JIB and JTL back Fabian Society call to invest in skills for a stronger built environment workforce.




















