Superstructure
The Building Cost Information Service (BCIS), Elemental Standard Form of Cost Analysis Principles, Instructions, Elements and Definitions 4th (NRM) Edition published by the Royal Institution of Chartered Surveyors (RICS) in 2012, describes the rules for preparing an elemental cost analysis in standard BCIS format.
According to BCIS, the term 'superstructure' includes:
- Frame: Load-bearing framework. Main floor and roof beams, ties and roof trusses of framed buildings; casing to stanchions and beams for structural or protective purposes.
- Upper floors: Suspended floors over, or in basements, service floors, balconies, sloping floors, walkways and top landings, where part of the floor rather than part of the staircase.
- Roof: Roof structure, roof coverings, roof drainage, rooflights and roof features.
- Stairs and ramps: Construction of ramps, stairs, ladders, etc. connecting floors at different levels.
- External walls: External enclosing walls including walls to basements but excluding walls to basements designed as retaining walls.
- Windows, doors and openings in external walls.
- Internal walls, partitions, balustrades, moveable room dividers, cubicles and the like.
- Doors, hatches and other openings in internal walls and partitions.
This excludes; the substructure, finishes, fittings, furnishings, equipment and services.
Some broader definitions simply consider the superstructure to include all works above ground level, although clearly, this is a fairly ambiguous description.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.


















Comments