Specification guidance for construction
When writing architectural specifications getting the basics in place from the start will help you build a document suitable to your needs. Listed below are some basic rules to follow when writing your next specification:
- Always edit your specification to reflect your appointment and the selected procurement route.
- Always start from a solid baseline document. Do not take the last project you prepared a specification for and change the headers and footers. No matter how vigilant you are, mistakes such as naming the wrong project, specifying incorrect materials and other basic errors will creep into your documents.
- Avoid using the term 'or similar approved' in a specification. If you approve it you are assuming liability for it. Instead use the term ‘or acceptable equivalent’. By accepting an alternative the responsibility for Fitness for Purpose moves to the contractor and the architect's acceptance is for design intent only. If the architect approves, they take back that responsibility. Normally, alternatives are offered for program or cost reasons and the contractor is responsible for the fact that they are providing a different product that must be at least as good quality-wise as the one specified by the architect. If the architect is specifying by description only, the contractor is obliged to provide the technical solution which again they have to be responsible for in terms of quality, performance, appearance and fitness for purpose.
- The proper use of defined terms is important in a specification. Check your contract.
- Document/section identification should appear on every page in the footer for document control purposes.
- Avoid putting specification clause numbers on your drawings. The use of product reference codes is recommended which should all be included on a technical reference sheet (T-Sheet) that links the drawings and the specification. This makes life much easier when changes are required.
- Avoid mixing prescriptive and performance specifications, that is, don’t name a very specific product and then provide performance characteristics for that product – this is not necessary and creates the potential for conflict resulting in claims.
- Avoid specifying temporary works – this is the contractor’s responsibility. Just specify the need to protect adequately, not how to do it.
- Remove names of individuals when specifying products and just provide the company’s details.
- Remove unfinished clauses and terms such as 'if required'. If you are specifying a specific technical solution then you have to specify everything.
- Do not highlight particular clauses by using bold or underlining, as this indicates that the clause is of special importance and there is no such thing in a specification, as by default it indicates that everything else is not so important.
- Always allow time to have your specifications proof-read.
[edit] Related articles on Designing Buildings Wiki
- Bill of quantities.
- Common Arrangement of Work Sections (CAWS).
- Comparison of SMM7 with NRM2.
- Final specifications.
- Insulation specification.
- New Rules of Measurement (NRM)
- Output-based specification.
- Outline specification.
- Performance specification.
- Prescriptive specification.
- Procurement.
- Specification.
- Standard Method of Measurement (SMM7).
- Tender documentation.
- What should be included in a scope of work?
Featured articles and news
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.