Wet alarm valve
The Loss Prevention Certification Board (LPCB part of BRE Global) sets the standards needed to ensure that fire and security products and services perform effectively. LPCB’s Loss Prevention Standards (LPS) are applied in fire and security sectors around the world.
LPS 1040 - 2.3, Requirements and testing procedures for the LPCB approval and listing of wet alarm valve sets, published by BRE Global in 2014, defines a wet alarm valve as: ‘A valve that permits flow of water into a wet sprinkler system, prevents reverse flow of water and provides for an alarm under specified flow conditions.’
A wet alarm valve set is: ‘An alarm valve assembly complete with wet alarm valve, trim and water motor alarm. Optional items, such as a retard chamber, flow meter, pressure switch and flow switch may also be included as part of the wet alarm valve set.’
[edit] Related articles on Designing Buildings Wiki
- BRE articles on Designing Buildings Wiki.
- Differential ratio of a wet alarm valve.
- Sprinkler.
- Automatic fire sprinkler systems: A good practice guide.
- Business Sprinkler Alliance.
- Case study A for offices to show where automatic sprinklers have the greatest impact.
- Costs of water automatic sprinkler systems.
- Design benefits of automatic sprinkler systems granted under approved document B.
- Drenchers.
- Making the case for sprinklers and dispelling myths.
- Overview of automatic sprinkler system design and operation.
- Sprinkler systems explained: A guide to sprinkler installation standards and rules.
- The cost efficiency of different combinations of fire protection measures.
- The impact of automatic sprinklers on building design.
- Watermist systems for fire protection in domestic and residential buildings DG 534.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.