Retard chamber
The Loss Prevention Certification Board (LPCB part of BRE Global) sets the standards needed to ensure that fire and security products and services perform effectively. LPCB’s Loss Prevention Standards (LPS) are applied in fire and security sectors around the world.
LPS 1040 - 2.3, Requirements and testing procedures for the LPCB approval and listing of wet alarm valve sets, published by BRE Global in 2014, defines a retard chamber as: ‘A volumetric device designed to minimize false alarms caused by surges and fluctuation in sprinkler system water supplies.’
The retard time is: ‘This is the time from the first passage of water through the alarm part of the valve (with and without the retard chamber), to the sounding of the alarm device.’
[edit] Related articles on Designing Buildings Wiki
- BRE articles on Designing Buildings Wiki.
- Clapper.
- Drenchers.
- K factor.
- Making the case for sprinklers and dispelling myths.
- Overview of automatic sprinkler system design and operation.
- Sprinkler systems explained: A guide to sprinkler installation standards and rules.
- Sprinkler.
- The cost efficiency of different combinations of fire protection measures.
- The impact of automatic sprinklers on building design.
- Watermist systems for fire protection in domestic and residential buildings DG 534.
- Wet alarm valve.
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.