A clean energy future and the promise of opportunities for electrical contractors
Contents |
[edit] Clean Power 2030
The evolving landscape under the Government’s Clean Power 2030 Action Plan (May 2025) promises a golden era for ECA (Electrical Contractors' Association) Members. Clean Power 2030 is transforming the construction landscape. The significant investment in renewable generation and decarbonisation presents a wealth of opportunities in electrification infrastructure, grid integration, smart systems, and energy management.
Gary Parker, Head of Technical at ECA, said:
“With large-scale, long-term projects, coming on stream offering financial and reputational rewards, this is a very exciting time to work in our industry. Expertise in power systems, controls, energy storage, and grid connectivity will be pivotal to renewables, nuclear, storage, and infrastructure. This is a massive opportunity.”
The range of projects green-lit in the Clean Power 2030 Plan offer opportunities to diversify business and spread risk.
[edit] Nuclear Mega project – Sizewell C
The £38 billion Sizewell C nuclear power station in Suffolk was granted final approval in July 2025. It is the largest infrastructure project in the region’s history.
The electrotechnical scope includes: installation of high and low-voltage distribution systems, control and instrumentation (C&I), power monitoring, and safety circuits.
With all major projects, the electrification of associated infrastructure such as the Four Villages Bypass and a 2,400-bed worker campus, also offers opportunities. Installs of EV charging infrastructure, streetlighting, and integrated building systems will be in demand.
[edit] Offshore Wind
Together the projects from the current leasing round are expected to power around 6.5 million homes. Planning decisions are expected between August and late 2025.
Projects in the seas around England and Wales include Morgan Offshore Wind Farm (£2 billion, 1.5 GW capacity) and Morecambe Offshore Wind Farm (£1.5 billion, 480 MW). Power cabling (AC/DC), electrical substations, transformer systems, inter-array cabling, and control systems. Breakers, switchgear, SCADA, and safety interlocks will all be high-demand.
[edit] Onshore Renewables and Energy Storage
Esgair Galed Energy Park in Wales with 26 turbines will power 179,000 homes. While in England, Tillbridge Solar Farm (Lincolnshire), £250 million, 45–47 GW solar target-aligned project has been given Nationally Significant Infrastructure Projects (NSIP) status, with work expected to begin in 2026.
All project types will require expanded grid access, advanced substation work, HV cabling, and compliance with evolving electricity regulations.
There will be an increasing focus on demand-side response, real-time monitoring, and smart grid capabilities offering key areas for specialist contractors.
With projects spanning nuclear, offshore, onshore wind, solar, and storage, the potential for a golden era for ECA firms is positive.
This article appears on the ECA news and blogsite as "UK’s Clean Energy Future promises golden opportunities for ECA Members" date 18 August 2025.
--ECA
[edit] Related articles on Designing Buildings
- Air tightness.
- Are Energy Performance Certificates accurate?
- Building performance.
- Clean Power 2030 Action Plan
- Climate Change Act.
- Construction skills crisis threatens UK net zero goals.
- Display energy certificate.
- Energy performance certificate EPC.
- Energy related products regulations.
- Energy Savings Opportunity Scheme.
- Framework for net-zero carbon buildings launched in parliament.
- Geothermal energy.
- Government net zero review 2022.
- Hydroelectricity.
- Infrastructure carbon reduction misses net-zero target.
- Large scale solar thermal energy.
- Minimum energy efficiency standard (MEES).
- Minimum energy efficiency standard regulations for domestic and non-domestic buildings.
- Net zero carbon buildings. A UKGBC framework definition.
- Net zero carbon 2050.
- Net zero carbon building.
- Non-domestic private rented property minimum standard.
- Renewable energy.
- Simplified Building Energy Model.
- Sustainable development: energy challenge.
- The EPC consultation in the context of changes to the NCM.
- The Home Energy Model and Future Homes Standard assessment wrapper.
- Wind energy.
- Zero net regulated carbon emissions.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.