Shoring is the technique of using a temporary support, usually a form of prop, to make a structure stable and safe.
Shoring is often used to provide lateral support:
- To walls undergoing repair or reinforcement.
- During excavations.
- To prevent walls bulging out.
- When an adjacent structure is to be pulled down.
- When openings in a wall are made or enlarged.
There are three basic types of shoring system that can be used separately or in combination depending on the nature of the support required.
[edit] Raking shores
Raking shores involve inclined members, or rakers, typically placed at 3-4.5 m centres, and braced at regular intervals. They tend to be inclined at between 40-75º. Typical materials that are used include timber, structural steel, and framed tubular scaffolding.
Example:
|
[edit] Dead shores
Dead shores are primarily used to carry vertical loadings from walls, roofs and floors. This is often required when an opening is being made in a wall, or a defective loadbearing wall is being rebuilt. An arrangement of beams and posts support the structural weight and transfer it to the firm ground foundation below.
Example: When opening a wall, holes are cut so as to allow 300 x 300 mm beams, known as needles, to be inserted to carry the weight. These are usually placed at 1.2-1.8 m centres, and are supported by 300 x 300 mm vertical props known as shore legs at either end on both sides of the wall, with diagonal bracing as required. Needles are made of either timber or steel. The shore legs are taken down to a solid bed and secured on a 300 x 300 mm sleeper with folding wedges. The floor and ceiling finishes are removed locally around the shore legs. The shore legs stand away from both sides of the wall, usually allowing for a minimum of 1 m working space in between. To relieve the wall of the floor and roof loads, they are independently supported using 100 x 100 mm ceiling struts at 2 m centres. All doors, windows and other openings should be well strutted and secure before any dismantling work begins on the wall. |
[edit] Flying shores
Flying shores are used as an alternative to raking shores and provide a clear working space at ground level by exerting thrust on opposite walls, often the party walls of two buildings.
If walls are at different heights, unsymmetrical flying shores can be arranged. Often this is in combination with raking shore principles, i.e. top and middle raking shores above a horizontal shore, perhaps with a bottom raking shore below, with binding to both sides as required.
Example: Flying shores consist of horizontal shores (often 250 x 250 mm) placed between wall plates and supported by a system of needles and cleats. Inclined struts are supported at the top by needle and cleats, and by a 150 x 75 mm straining sill that is fastened to the horizontal shore. Single flying shores can typically be used for spans of up to 9 m. Double flying shores, in which two horizontal shores are connected using 150 x 150 mm studs, can be used for spans of up to 12 m. |
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Tackling the lack of knowledge or confidence in heat pumps
The CICV Green Home Festival part of the Edinburgh Fringe.
Home improvements swapped for green energy upgrades
As applications down since and desire to reduce bills up.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
The Use of Natural Insulation Materials in Retrofit
New paper from STBA with support from SDF.
National Retrofit Hub in partnership with InstallerSHOW.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Biodiversity and the built environment digital series
The nature of building, with CIOB and CWP.
A call for prevention and sensitive re-use.
Risks to the long-term effectiveness of the BNG scheme
National Audit Office publish review of Biodiversity Net Gain.
The CIAT principal designer register
Providing assurance and verification of the capability and competence of registered ATs.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.