Cross estimating method
The cross estimating method is a technique that involves using data from similar completed projects to estimate the cost of a new project. It is often used when there is limited information available on the new project or when there are significant uncertainties in the project scope, schedule, or other variables.
The accuracy of the cross estimating method depends on the quality and relevance of the data used in the analysis. It is important to ensure that the completed projects used for comparison are truly comparable to the new project and that any adjustments made to the cost data are based on sound reasoning and reliable data sources.
The first step is to identify completed projects that are similar in scope, size, complexity, and other relevant characteristics to the new project. This involves conducting research on completed projects in the same industry, geographic location, and with similar project requirements.
Once similar completed projects have been identified, the next step is to collect cost data on those projects. This can include data on labour costs, material costs, equipment costs, overhead costs, and other relevant costs associated with completing the projects.
The cost data collected from the completed projects may need to be adjusted to account for differences in inflation, location, market conditions, and other factors that may impact the cost of the new project. For example, if the projects were completed several years ago, adjustments may need to be made for inflation.
Once the cost data has been collected and adjusted, the next step is to calculate the cost for the new project. This involves using the cost data from the completed projects as a benchmark and making adjustments based on the unique characteristics of the new project.
Finally, the cost estimate should be verified to ensure that it is reasonable and accurate. This can be done by comparing the estimate to other cost estimates for similar projects, conducting a sensitivity analysis to assess the impact of changes in key variables, and seeking input from experts and other stakeholders.
[edit] Related articles on Designing Buildings
Featured articles and news
Our next guest editor Christine Peever
Practising Architect and Director of Sheldon Peever Studio.
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
New electrical apprentice rates
Fair pay for much needed pipeline of electrical apprentices.
BSRIA's commitment to sustainability and net zero
Key documents that represent an early shift in thinking.
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
A history of timber construction in the UK
From a timber Stonehenge to half timber houses.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.