Swept area
The consultation Permitted development rights for small scale renewable and low carbon energy technologies and electric vehicle charging infrastructure published March 2012 refers to swept area as 'The swept area is calculated as follows:pi (π) x radius2. Radius is half the total blade diameter."
The government Renewable and low carbon energy guidance designed to help local councils in developing policies for renewable and low carbon energy, identifying planning considerations refers to swept area in relation to potential impactzs on electromagnetic transmissions: "Wind turbines can potentially affect electromagnetic transmissions (eg radio, television and phone signals). Specialist organisations responsible for the operation of electromagnetic links typically require 100m clearance either side of a line of sight link from the swept area of turbine blades. Ofcom acts as a central point of contact for identifying specific consultees relevant to a site." (paragraph: 017 Reference ID: 5-017-20140306 revision date: 06 03 2014)
'.
[edit] Related articles on Designing Buildings
- Carbon capture and storage.
- Energy Act.
- Energy storage.
- Geothermal pile foundations.
- Ground energy options.
- Large scale solar thermal energy.
- Nimbyism.
- Renewable energy.
- Rainwater harvesting.
- Sustainability.
- Solar photovoltaics.
- Solar thermal energy.
- The future of UK power generation.
- Why the UK needs to support emerging tech like energy storage.
- Wind energy.
- Wind farm.
- Wind turbine.
- Windcatcher.
- World leaders urged to embrace wind energy.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.
Where its at podcast (and video) - The role of the Architectural Technologist as an Expert Witness.
More than 200 remarkable buildings added to SAVE’s Buildings at Risk register.
Government scraps pre-application consultation for Nationally Significant Infrastructure Projects.
Historic England and infrastructure
New projects offer opportunities for the historic environment and local communities.
Construction Management, 2 July
Construction deaths halve in two years.
Green Book changes to drive investment in all parts of UK.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.

















