Rolling wave programming
Programmes describe the sequence in which tasks must be carried out so that a project (or part of a project) can be completed on time. They offer a view of how the project will be divided into activities, the duration of those activities, and logic links to preceding and succeeding activities.
Programmes may be depicted as Gantt charts, bar charts, line-of-balance diagrams, pure logic diagrams, time-scaled logic diagrams, time-chainage diagrams and so on.
For more information see: Programme for building design and construction.
Rolling wave programming (or rolling wave planning) is a method of programme development in which the details of the programme are progressively elaborated as the project proceeds. This is based on the assumption that it will be possible to develop the plan for specific activities in more detail closer to the time that they are actually executed.
Ref The Society of Construction Law Delay and Disruption Protocol, 2nd edition, published in February 2017 by the Society of Construction Law (UK).
NB Earned Value Management Handbook, Published by the Association for Project Management in March 2013 suggests that planning packages (PPs): ‘…represent work that cannot yet be planned as work packages because of a lack of detailed information. They must be converted into work packages before they can commence.’
It proposes that: ‘The requirement for a periodic conversion, from planning package to work package, is the result of setting up the project using rolling wave planning, whereby only the current phase of a project is planned in detail and future phases are planned in outline. The conversion process is a fundamental aspect of project control using EVM (earned value management) and results in a more controlled project baseline.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.