Project information
Contents |
[edit] Introduction
On a building construction project, the ‘project information’ is all the information, in whatever format, that is used to create, communicate and realise the project from its inception.
Given the potentially large number of people that may be involved in such projects, including clients, consultants, contractors, subcontractors, and other stakeholders, the amount of information created can be enormous and may include letters, sketches, drawings, schedules, bills of quantities, specifications, contracts, models and so on. This includes information that, whilst it may have been superseded, nevertheless contributed to the overall realisation of the project and so is typically retained for record purposes.
The RIBA Plan of Work 2013 defines project information as; 'Information, including models, documents, specifications, schedules and spreadsheets, issued between parties during each stage and in formal Information Exchanges at the end of each stage.'
[edit] Types of information
The types of information that may be generated on a building project can include:
- Feasibility studies, options appraisals, sketches, design drawings (plans sections, elevations), working drawings, schedules (e.g doors, windows, ironmongery etc), models, specifications, instructions, request for information, letters, etc.
- Reports, calculations, drawings, junction details, site surveys, test results etc
- Bills of quantities and schedules.
- Contracts, invoices, purchase orders, certificates, notices.
- Applications and permissions.
[edit] Information formats
The advent of the digital age and increasingly of proprietary software has meant that a wide range of formats are available for information. In addition to the traditional formats of hard-copy print (namely paper), information may also be created as digital files, such as CAD (e.g AutoCAD and Revit), data that may be kept as a part of a building information model (BIM) and so on.
This can cause interoperability problems, and file exchange formats have had to be developed that can allow the transfer of information between different types of proprietary software (with varying success).
[edit] Storage
For storing information there are various options:
- Traditional filing cabinets and drawing chests (for paper-based information);
- Local computer hard drives;
- Cloud-based services;
- Common data environments.
[edit] The advent of digital
The digital revolution that has occurred in the past two decades has, in some respects, served to generally reduce the amount of paper that is produced in a building project. The old practice of issuing drawings to the client and other consultants, then reissuing them with amendments, repeating the process whenever new amendments were needed so that each person amassed a wodge of drawings, may no longer be necessary.
In place of paper-based information, an electronic file may simply be emailed to the relevant parties or, if BIM is being used, the model can be updated once in real time: the updated information is available instantly and accessed whenever any of the parties choses to see the model. This means far less paper is generated (therefore better for the environment) and everybody sees the latest version of the information. Even email has reduced the amount of paper being used: fewer letters in the post, fewer faxes being sent and cheaper than sending mail in the post.
[edit] Change control
At certain stages in the design process, a complete package of information will be provided for the client to approve. Once this approval has been given, a change control procedure may be introduced to ensure that the approved information is not changed without the express permission of the client.
For more information see: Change control.
[edit] Document control
An understanding of where information is, who created it, what it is for and how to retrieve it is extremely important in order to avoid confusion and mistakes.
Organisations may have their own internal quality management system or ISO 9001 certification that sets out their document control procedures, but on a building design project, the consultant team members and the client may wish to agree a common system of document control.
For more information see: Document control.
[edit] Related articles
Featured articles and news
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.