Primary structure
Contents |
[edit] Introduction
The term primary structure can be loosely defined as all of the components in the building that are necessary in order to keep the structure standing.
[edit] Primary and secondary structural frames
A primary structural system is typically designed by a structural engineer. It is sometimes referred to as the primary structural frame.
The International Building Code (IBC) determines how structural frames should be protected from fire in a manner that preserves the stability of the building based on their relationship to essential elements of the structure. Regarding regulation for the purposes of required fire resistance, the IBC divides structural frames into two categories: primary (essential to the vertical stability of the building under gravity loads) and secondary (structural members that are not directly connected to columns or supporting gravity loads). Provisions regulating primary structural frame members generally are more restrictive than those regulating secondary members due to the increased loading conditions and lack of redundancy associated with them.
According to International Code Council’s Significant Changes to the International Building Code 2021 edition, primary structural frame members include:
- Columns.
- Structural members having direct connections to the columns, including girders, beams, trusses and spandrels.
- Members of the floor and roof construction having direct connections to the columns. This may include concrete slabs that span horizontally between supports and can sometimes be used as floor and roof systems.
- Members that are essential to the vertical stability of the primary structural frame under gravity loading. This includes bearing walls or sheer walls which are assemblies rather than single components. These can include structural panels that can resist lateral forces (such as wind and seismic loads) that could act on them.
The following components are considered secondary structural members and not part of the primary structural frame:
- Structural members not having direct connections to the columns.
- Members of the floor construction and roof construction not having direct connections to the columns.
- Bracing members that are not designated as part of a primary structural frame or bearing wall.
[edit] Primary structures and multi-storey steel construction
In multi-storey buildings, there are many factors that can influence the design of the primary structure. This can include:
- Floor layout. An open floor plan may be desirable in situations where it is necessary to create flexible interior space.
- Cladding systems. The choice of cladding system may include components that are attached to the primary structure of a building to form a non-structural external surface.
- Planning requirements. Height restrictions in an area can influence plans for multi-storey buildings. Site conditions can prevent certain types of foundation systems and their locations.
- Building service integration. Effective integration of services can dictate decisions regarding primary structure design.
[edit] Modern Methods of Construction
The term primary structural systems is also used in reference to Modern Methods of Construction, Introducing the MMC definition framework, published by the Ministry of Housing, Communities & Local Government, which became the Department for Levelling Up, Housing and Communities in September 2021. The term is used in relation to the seven defined categories for MMC.
For more information, see Pre-manufacturing components (non-systemised primary structure).
[edit] Related articles on Designing Buildings
- Cladding for buildings.
- Concept structural design of buildings.
- Off-site prefabrication of buildings: A guide to connection choices.
- Pre-manufacturing components (non-systemised primary structure).
- Structural principles.
- Structural systems for offices
[edit] External resources
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.