Preston Barracks, Brighton
In February 2018, Brighton and Hove Council sold its derelict Preston Barracks site to the developer U+I Group; clearing the way for a significant mixed-use regeneration project. U+I simultaneously exchanged contracts to partner with Scape Student Living to deliver 534 student beds.
The scheme is part of a wider regeneration initiative to transform an area of Brighton, establish the University at the centre of Brighton’s economic life, attract enterprising and high-growth companies, and attract international investment.
Designed by award-winning architects HASSELL, Studio Egret West, TP Bennett and Stride Treglown, the proposals for the 2.2 hectare plot include the development of the Preston Barracks site (which has been derelict for more than 20 years), the University’s Moulsecoomb campus and adjoining University land comprising:
- 369 new homes.
- 1,338 student beds.
- New academic buildings.
- 25,000 sq. ft. of retail space.
- A 55,000 sq. ft. commercial building for start-ups and SMEs in high-tech manufacturing.
The project was granted planning permission in September 2017. It is hoped that the £300 million public private partnership project will create more than 1,500 jobs, and attract more than £500 million into the city over the next ten years.
Richard Upton, Deputy Chief Executive of U+I, said:
"The Preston Barracks project is one of the largest and most ambitious regeneration projects to have been brought forward in Brighton for a number of years. We will deliver world class, imaginative urban design, leaving a lasting legacy that befits such an inspirational city".
In May 2018, it was confirmed that John Graham had been appointed main contractor for the first phase of the construction works.
Graham's contract is for a seven-storey concrete-framed workspace building, targeting a BREEAM 'excellent' rating. The Central Research Laboratory will be used as a workspace aimed at small businesses and start-up companies. It is expected to be completed by the end of 2019.
U+I development manager Sarah Chitty said: “We’re proud to be working with Graham on the first phase of the project. Their commitment to supporting local communities and economies is closely aligned to our own vision to create long lasting benefits for the places in which we work.”
Graham development director Rob Joyce said: “Our main objective is to create a high-quality commercial building that will attract enterprising, high-growth companies to the area. We will work closely with U+I and the project team to ensure that it provides a range of functioning spaces that are tailored to the needs of the individuals using it, while fostering entrepreneurship and excellence in innovation.”
--U and I
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki:
- Articles by U and I.
- Blackhorse Road regeneration.
- Cathedral Group.
- Circus Street, Brighton.
- Clapham One.
- Development Securities.
- Maidstone development.
- Mixed-use development.
- Placemaking.
- Public private partnership.
- Regeneration.
- The Deptford Project.
- The Movement, Greenwich.
- U and I.
- UandI Think event with John McDonnell MP.
[edit] External references
- U+I - Preston Barracks
Featured articles and news
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.



























Comments