Panda House, Copenhagen Zoo
In March 2017, designs were released for a new yin-and-yang-shaped Panda House for Copenhagen Zoo, Denmark.
The project is a collaboration between Bjarke Ingels Group (BIG), Schønherr Landscape Architects and MOE. The Panda House is intended to resemble the animals’ natural habitat, creating a peaceful environment for one of the world’s rarest mammals. Copenhagen Zoo, one of the oldest in Europe, already includes the award-winning Elephant House, designed by Norman Foster.
The Panda House encompasses a 1,250 sq. m indoor site and a 1,200 sq. m outdoor area, with the circular shape formed by the surrounding existing facilities at the intersection of a number of walkways. The design gives the impression that humans are the ‘visitors in the panda’s home, rather than pandas being the exotic guests from faraway lands’, with the eye-level view heightening a sense of immersion within wildlife and nature.
The ground floor provides access to the interior spaces via a ramp, while the upper floor leads to a rocky slope through Nordic plants and a dense bamboo forest. The vegetation and landscaping mimics the natural environment of the pandas, with provision for both shade and sun, by creating a dense and lush ‘mist forest’ and a light green bamboo forest.
The ground is raised at both ends of the yin-and-yang symbol, allowing direct views into the habitat. Visitors can dine in a restaurant on the ground floor, allowing them to observe the pandas and the adjacent elephants.
Construction on the habitat is scheduled to begin later in 2017, once the budget of 150 million DKK has been secured. It is due to open in 2018, when two giant pandas from Chengdu will arrive at the zoo. The pandas are being given by the Chinese government as a goodwill gesture following the Queen of Denmark’s visit in 2014.
Bjarke Ingels, Founding Partner, BIG said:
“To design a home for someone is like capturing their essence, their character and personality in built form. In the case of the two great pandas, their unique solitary nature requires two similar but separate habitats - one for her and one for him. The habitat is formed like a giant yin and yang symbol, two halves: the male and the female, complete each other to form a single circular whole.
"The curvy lines are undulating in section to create the necessary separation between him and her - as well as between them and us. Located at the heart of the park, we have made the entire enclosure accessible from 360-degrees, turning the two pandas into the new rotation point for Copenhagen Zoo.”
Steffen Stræde, Zoo Director, Copenhagen Zoo said:
“Copenhagen Zoo’s idea-driven organisation was key in defining the team we wanted to work with on the new Panda House project. It’s part of our DNA to let everyone from zookeepers, to gardeners and vets, influence the design and function of the facilities to secure the well-being of our animals. The team understood our approach and successfully integrated it into their design process to create a world-class home for these adored pandas.”
Images and content courtesy of BIG.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.





























