Manufacturing and construction
The process for completing the design and construction of a building is often divided into stages. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments.
However, there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages actually include, and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required.
‘Manufacturing and construction’ is a new stage introduced by the RIBA Plan of work 2020. This replaces ‘Construction’ in the 2013 edition and reflects the increasing prevalence of manufactured systems and components and volumetric construction.
The RIBA Plan of Work is published by the Royal Institute of British Architects (RIBA). Split into a number of key project stages, the RIBA Plan of Work provides a shared framework for design and construction that offers both a process map and a management tool.
The RIBA Plan of Work 2020 changed the structure of the stages as shown below:
Stage | 2013 edition | 2020 edition |
0 | Strategic definition. | Strategic definition. |
1 | Preparation and brief. | Preparation and briefing. |
2 | Concept design. | Concept design. |
3 | Developed design. | Spatial coordination. |
4 | Technical design. | Technical design. |
5 | Construction. | Manufacturing and construction. |
6 | Handover and close out. | Handover. |
7 | In use. | Use. |
The 2020 edition of the RIBA Plan of Work suggests that stage 5, manufacturing and construction: ‘…comprises the manufacturing and construction of the Building Systems in accordance with the Construction Programme agreed in the Building Contract. Increasingly, digital technologies are being used to rehearse different construction activities, allowing Stage 5 to be faster and safer. As the construction industry moves towards greater uptake of offsite manufacturing, greater emphasis is also placed on the logistics of getting materials and large-scale components to site on time, and on the management of supply chain partners.’
Stage 5 concludes by issuing a practical completion certificate which allows the completed development to be handed over to the client. The Plan for Use Strategy described by the RIBA requires that several tasks are undertaken to prepare for this, before and after practical completion.
[edit] Related articles on Designing Buildings Wiki
- BREEAM and RIBA stages.
- Comparison of BIM work stages.
- Governance for Railway Investment Projects (GRIP).
- NBS.
- OGC gateway review.
- Plan of work.
- Project lifecycle for major road projects.
- Record keeping.
- RIBA Plan of Work for Fire Safety.
- RIBA plan of work v project plans v OGC gateways.
- RIBA plan of work.
- RIBA plan of work 2020.
- RIBA.
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.