Comparison of BIM work stages
This article attempts to compare the different work stage definitions that have been adopted in standard industry BIM documentation.
|
PAS 1192 |
APM (listed in CIC BIM protocol) |
RIBA 2013 |
(attributed to PAS 1192) |
| 1 Brief | 0 Strategy | 0 Strategic definition | 1Brief |
| 1 Brief | 1 Preparation and brief | ||
| 2 Concept | 2 Concept | 2 Concept design | 2 Concept |
| 3 Definition | 3 Definition | 3 Developed design | 3 Developed design |
| 4 Design | 4 Design (production information) | 4 Technical design (Procurement is flexible and does not have a numbered stage) | 4 Production |
| 5 Build & Commission | 5 Build & Commission | 5 Construction | 5 Installation |
| 6 Handover & Closeout | 6 Handover & Closeout | 6 Handover & Closeout | 6 As constructed |
|
In use (no number) |
7 Operation and end of life | 7 In use | 7 In use |
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.