Comparison of BIM work stages
This article attempts to compare the different work stage definitions that have been adopted in standard industry BIM documentation.
|
PAS 1192 |
APM (listed in CIC BIM protocol) |
RIBA 2013 |
(attributed to PAS 1192) |
| 1 Brief | 0 Strategy | 0 Strategic definition | 1Brief |
| 1 Brief | 1 Preparation and brief | ||
| 2 Concept | 2 Concept | 2 Concept design | 2 Concept |
| 3 Definition | 3 Definition | 3 Developed design | 3 Developed design |
| 4 Design | 4 Design (production information) | 4 Technical design (Procurement is flexible and does not have a numbered stage) | 4 Production |
| 5 Build & Commission | 5 Build & Commission | 5 Construction | 5 Installation |
| 6 Handover & Closeout | 6 Handover & Closeout | 6 Handover & Closeout | 6 As constructed |
|
In use (no number) |
7 Operation and end of life | 7 In use | 7 In use |
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.
Campaigning for Edinburgh: the Cockburn Association 1875-2049
The role of the civic voice in protecting character. Book review.
CIOB photography competition is open for entries.
ECA Edmundson apprentice of the year award
Finalists announced.
Major new study exposes serious knowledge gaps.
Generating energy from internal light as well as sunshine.
ECA welcomes plans to strengthen subcontractor quality control.
Combining mid-career qualifications with experience broadens career opportunities.

















