Lifting Operations and Lifting Equipment Regulations (LOLER)
The Lifting Operations and Lifting Equipment Regulations (LOLER) place legal duties and responsibilities on those who own, operate or have control over lifting equipment. It was created under the Health and Safety at Work etc. Act 1974, and came into force in 1998, replacing several preceding pieces of legislation which had previously regulated the use of lifting equipment.
LOLER defines lifting equipment as ‘work equipment for lifting or lowering loads and includes its attachments used for anchoring, fixing or supporting it.’
Equipment covered by the regulations includes:
- Lifts.
- Cranes.
- Ropes.
- Slings.
- Hoists.
- Rope and pulley systems.
- Forklift trucks.
The regulations require:
- That lifting equipment is strong and stable enough for safe use.
- Equipment is marked to indicate safe working loads.
- Equipment is positioned and installed so as to minimise risks.
- A competent person plans, organises and performs the safe use of the equipment.
- Equipment is subject to ongoing thorough examination and inspection.
LOLER may not apply where a lift is not used by people at work (such as a lift in a shop used by customers). However, Section 3 of the Health and Safety at Work Act imposes general responsibilities for the safety of users.
LOLER requires that lifts are thoroughly examined by a competent person at least every six months or, in the case of goods-only lifts, every 12 months. Insurance companies will generally request that a third party independent inspector to carries out the inspections. The minimum requirements are:
- Every six months for lifting equipment used for lifting/lowering persons.
- Every six months for lifting accessories.
- Every 12 months for all other lifting equipment not falling into either of the categories above.
A competent person may determine a different time scale.
For more informaton visist the UK government HSE website directly.
[edit] Related articles on Designing Buildings
- Avoiding crane collapses.
- Considerations When Installing a Residential Lift.
- Crane regulations.
- Lifting device.
- Lifting platform.
- Lifts for buildings.
- Pulley.
- Site records and registers.
- Temporary demountable structures.
- Work at height.
- Work at height checklist for managers.
- Work at height regulations.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.