Illuminance
According to BRE’s The essential guide to retail lighting:
Illuminance is ‘The level of light on a surface; measured in lux (lx). Previously called the illumination value. It can be used as a reference measurement of the performance of a lighting system as related to the activity.'
It is measured in lux (lx), the ‘...SI unit (the International System of Units) of illuminance or amount of light on a surface. One lux is equal to one lumen per square metre (lm/m^2)’ where a lumen (lm) is the ‘...SI unit of luminous flux, describing the quantity of light emitted by a lamp or received at a surface.’
Average illuminance is ‘The illuminance averaged over a specific area. In practice, this may be derived either from an average of the illuminances at a representative number fo points on the surface, or from the total luminous flux falling on the surface divided by the total area of the surface’
Maintained illuminance is ‘Illuminance at the time when maintenance is expected to take place. Most values of illuminance that are quoted as applicable to a store, eg 500-1000 lx, refer to this value. The time taken to reach the maintained illuminance level would depend on the lamp types and application’.
[edit] Related articles on Designing Buildings Wiki
- Ballast or control gear.
- Colour appearance.
- Colour Rendering Index CRI.
- Commercial lighting.
- Daylight benefits in healthcare buildings.
- Daylight factor.
- Daylight lighting systems.
- Dichroic reflector.
- Discharge lamp.
- Extra-low voltage lamps.
- General lighting v task lighting.
- Lamps.
- Lamp efficacy.
- Light pollution.
- Lighting.
- Lighting designer.
- Lighting energy numeric indicator LENI.
- Lighting of construction sites.
- Luminaire efficacy.
- Lux.
- Rights to light.
- Uniformity of illuminance.
Featured articles and news
Not buildings. Happy holiday from DB.
Future Homes Standard: Industry calls for more ambition
As the Government FHS consultation finally closes.
Improving government projects with data and AI
Enabling better outcomes, efficient modern delivery and influential leadership on government projects.
BSRIA Living Laboratory Innovation Challenge
Final days for submission, closing March 29.
Windows, their frames, forms, factors and functions.
The hidden subtleties of U-Value calculations
Different contexts and what to include as variables.
A brief run down with related articles.
Electrical sector calls for safer public EV charge points
Serious concerns about electrical safety in the public domain.
Building Blocks manifesto presented to parliament
Architects Declare call in for support of five critical policies.
The four elements of project management with APM
Analysis, expectations, collaborative communication and partnerships.
City of London launches Heritage Building Retrofit Toolkit
Empowering owners to initiate necessary adaptations.
Guidance on RAAC in listed buildings
Published by Purcell, endorsed by IHBC, SPAB and C20.
Learning from the past.
Reluctance to hire people with criminal convictions revealed
Employing People with Criminal Convictions Report.
Tackling unconscious bias; Women's History Month
Personal reflections, as the last week of March approaches.