ICE Conditions of Contract
The ICE Conditions of Contract (CoC) were published by Thomas Telford on behalf of the Institution of Civil Engineers (ICE), the Association of Consulting Engineers (ACE) and the Civil Engineering Contractors Association (CECA). The first edition was published in 1945 and the seventh and final edition was published in 2001. During this time it was the dominant form of contract for civil engineering.
The key characteristics of the contract were:
- Valuation by measurement.
- Engineering responsibility for design.
- Engineer as the impartial certifier and valuer.
- Engineer's decision as the first stage of dispute resolution.
When the seventh edition was being prepared, pressure started to build for ICE to withdraw its support for CoC in favour of NEC.
NEC was first published in 1993 as the New Engineering Contract. It is a suite of construction contracts intended to promote partnering and collaboration between the contractor and client. It was developed as a reaction to more traditional forms of construction contract which were seen by some as adversarial. The third edition, NEC3 was published in 2005. NEC is a division of Thomas Telford, the commercial arm of ICE.
In 2001, at the launch of the seventh edition of CoC, Author, Brian Eggleston wrote ‘ One strongly expressed view was that with the Institution's New Engineering Contract (now called NEC Engineering and Construction Contract) steadily gaining ground and recognition there was no point in continuing the publication of traditional ICE Conditions…. My own view is that not only is there room for both sets of conditions in the industry but there is need for both. It is a matter of horses for courses as to which type of contract is best for any particular project. The New Engineering Contract requires project management skills, high staffing levels and a prominent place on office desks. Traditional ICE contracts have been satisfactorily run for decades and in thousands by civil engineers practising their ordinarily professional skills, frequently with mud on their boots and with the Conditions rarely on the office desk. The strength of the Conditions is in their consistency and continuity and by any standards they must be regarded as one of the most successful standard forms ever published.”
Despite this, with the growing popularity of NEC, in 2009 the ICE Council formally endorsed the NEC contracts and ICE transferred its part in the ownership of CoC to ACE and CECA. ICE, ACE and CECA continue to hold reference copies of the last published version of the ICE Conditions of Contract, but no longer support it or offer it for sale.
In August 2011, ACE and CECA relaunched CoC as the Infrastructure Conditions of Contract (ICC) a standard suite of forms of contract largely based on CoC.
[edit] Related articles on Designing Buildings Wiki
- Atkins v Secretary of State for Transport.
- Collaborative practices.
- Construction contract.
- Contract conditions.
- FIDIC.
- Infrastructure conditions of contract.
- Institution of Civil Engineers.
- JCT.
- Latham Report
- NEC contract change management systems.
- NEC contracts - road development and management schemes.
- NEC early contractor involvement.
- NEC3
- Procurement route.
Featured articles and news
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.
The emancipation of women in art.
Call for independent National Grenfell oversight mechanism
MHCLG share findings of Building Safety Inquiry in letter to Secretary of State and Minister for Building Safety.
The Architectural Technology Awards
AT Awards now open for this the sixth decade of CIAT.
50th Golden anniversary ECA Edmundson awards
Deadline for submissions Friday 30 May 2025.
The benefits of precast, off-site foundation systems
Top ten benefits of this notable innovation.
Encouraging individuals to take action saving water at home, work, and in their communities.
Takes a community to support mental health and wellbeing
The why of becoming a Mental Health Instructor explained.