Dispute resolution
|
Construction projects are usually long-term operations with high uncertainty and complexity, and it is impossible to resolve every detail and foresee every contingency at the outset. As a result, situations often arise that result in disputes between the parties to the contract.
The likelihood of disputes arising can be reduced by:
- Preparing clear, unambiguous and consistent project information with defined information release schedules.
- Properly assessing risks.
- Ensuring funding is in place.
- Selecting an appropriate procurement route with suitable allocation of risk.
- Using standard, unmodified forms of contract.
- Ensuring the project team have the appropriate skills and resources.
- Minimising changes.
- Agreeing realistic time schedules with consistent workloads.
- Programming works so there are no unnecessary delays.
- Managing third-party dependencies.
- Adopting collaborative working practices.
- Maintaining clear lines of communication and keeping good records.
- Issuing warnings where there may be problems.
- Tackling and settling disputes quickly.
- Taking action to mitigate problems.
- Not exaggerating claims.
Where disputes occur, the parties to the contract should first attempt to resolve them amongst themselves, as this is likely to be the fastest and least expensive solution, allowing the project to continue without disruption and maintaining good working relationships.
Where this is not possible, it may be necessary to seek a third party to resolve the dispute.
However, taking disputes to the courts can be expensive, complex, adversarial and time consuming. This may not be appropriate on construction projects, where a quick resolution may be needed so that the works can proceed and where it is important that the parties to the contract maintain a good working relationship.
As a result, construction contracts usually include provisions for the resolution of disputes by agreed alternative dispute resolution procedures (ADR). These are typically less formal than court proceedings and should be faster, less expensive and less times consuming, allowing the parties to maintain a good relationship.
Construction contracts are also subject to statutory schemes, such as the Housing Grants, Construction and Regeneration Act, which impose ADR in the absence of appropriate contractual terms.
ADR typically involves procedures such as mediation, adjudication, arbitration, or a combination. Large or complex projects may have additional tiered dispute resolution procedures (with obligations to negotiate in good faith), dispute resolution boards, steering committees and partnering meetings. For more information see: Alternative dispute resolution.
Where court action is necessary, the Technology and Construction Court (TCC) is a specialist court, which deals principally with technology and construction disputes. However, in many cases, there will be a compulsory Pre-Action Protocol to encourage the frank and early exchange of information about the prospective claim and any defence to it. This can enable the parties to avoid full court proceedings by agreeing a settlement before commencement. It also supports the efficient management of proceedings where full court proceedings cannot be avoided.
In the event of a dispute arising, the contract administrator may:
- Arrange an informal negotiation/discussion with both parties
- Advise on the various processes and which one to use
- Notify the client of contractual obligations
- Notify the contractor of contractual obligations
- Provide all necessary information when required
- Tread carefully before becoming directly involved
- Provide all necessary advice to the client but not directly negotiate on their behalf.
The Global Construction Disputes Report published by Arcadis in 2019 found that the UK remains the jurisdiction with the shortest average length of time to solve a dispute at 12.8 months, and that the average value of disputes in the UK has fallen 47% to US$ 17.9 million. Negotiation remains the preferred method of resolution.
[edit] Related articles on Designing Buildings
- Adjudication.
- Alternative dispute resolution legislation.
- Alternative dispute resolution.
- Arbitration.
- CLC document on claims and disputes in construction.
- Clear contracts during uncertain times.
- Compulsory Alternative Dispute Resolution.
- Conflict avoidance.
- Construction disputes.
- Contract claims.
- Defects.
- Delays on construction projects.
- Dispute avoidance.
- Dispute resolution board.
- Expert evaluation.
- Expert witness.
- International research into the causes of delays on construction projects.
- Liquidated damages.
- Loss and expense.
- Mediation.
- Negotiation techniques.
Featured articles and news
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.























Comments
Possibly worth adressing substantially in this article as a core issue towards reducing the likelyhood of disputes arising is what would be at the source of the factors listed in the article existing in the first place as significant concerns to address. The list mentions "Properly assessing risks" while it should possibly actually say "Properly managing risks". At the source of most disputes features prominently project sponsors and/or participants to manage project risks primarily by transfer to others and by systematic converstion of the nature of risks into financial terms. Unintelligent/unreasonable risk transfers (downloading the responsibility to manage risks to entities that can not materially nor be reeasonably expeected to exercize the level of control and authority commensurate to the nature and/or importance of any given risk) is often the direct reason why the means to reduce disputes listed in the article fail to be implemented or even provided for. Managing risks by essentially evacuating them by transfer is a fundamentally delusional strategy. Transferring risks mostly produces downstream risk transfer chains, certain to fail at the weakest link. In fact, wholesale transfer of project risks merely creates a new risk, often cruelly underestimated in terms of probability and impact if at all actually assessed : failure of the risk transfer strategy. Failures in risk transfer strategy (including where everything is converteed into financial compensaiton) always occur after harm has been done to the project and damages incurred and, predictably, disputes having been triggered.