Green wood timber
Contents |
[edit] What is green wood?
The term green wood (or green timber) refers to a type of timber which has been freshly cut, and because of its high moisture contents, it is softer to work with, more flexible and less brittle. It relates to the forest term 'greenwood' because it is considered to be living, green or active and thus containing more water, but it is also prone to greater movement and deformation as it looses that water, dries or seasons over time. The term greenwood refers to a living forest during the season when the leaves are lush and green. It was often used to describe an idealised forest setting for historical stories such as Robin Hood.
The opposite of green wood is seasoned wood, which is wood that has been left to dry in a covered area for a period dependent on the conditions and type of timber.
[edit] Moisture in green wood explained
Moisture content, or %MC, is the measurement of how much water is present in wood compared to the dry matter of the wood. Although not very common, technically, it is possible to have a moisture content of over 100% and up to 200%, this happens when there is more water than wood in the sample being tested. Green wood has significantly more free water in it than seasoned wood, this means it is less stable and likely to move as it seasons.
A guide to the use of urban timber (FB 50), written by Geoff Cooper and published by BRE on 31 July 2012, defines green timber as: 'A term used to describe wood which has been freshly cut and still contains a high percentage of moisture (free moisture).'
Free water or free moisture refers to water that is stored in the cell cavities, water that is stored within the cell walls is referred to as bound water. The higher the %MC of the timber, the more free water it contains between the cells, and green wood tends have very high levels of moisture, up to 100% or more. This is significantly higher than the Fibre Saturation Point (FSP) which is around 30%, under this percentage the bound water is within the cells. The drying of bound water generally has a greater impact on the shape or form of timber.
[edit] Traditional green oak frame
Once seasoned, timber becomes more stable and harder, so most timber products are seasoned before use, however traditional green wood or green oak framing makes use of non-seasoned wood to ease cutting and preparation of the timber frames, particularly of the joints. Traditional timber frames are a common part of UK and European vernacular buildings, most would have been built using green wood joints with timber dowels that removed the need for metal fixings.
Timber dowels are small round pins, usually of oak or a similar material that has been seasoned. The dowel is dry when it is inserted into a joint of green wood, so it soaks the moisture from the freshly cut wood and expands. The expansion of the dowel creates a tight fixing for the green wood. Over time and exposure to the elements, the frame and the dowel season, become drier and harden and create a rigid connection and stable frame.
Many traditional houses of the oak frame tradition were constructed this way. Often a frame would be left for a year without cladding to allow it to season and become rigid. It would then be clad and walls in-filled with wattle and daub.
[edit] Contemporary green oak frame
Innovative use of green wood in contemporary architecture has included the construction of timber gridshells, in particular the Weald and Downland Living Museum gridshell built by Edward Cullinan Architects, Buro Happold and the Green Oak Carpentry Company. This gridshell structure used the flexibility of green wood oak, through a diagonal grid of laths laid flat on supporting scaffold, the edges lowering gradually over weeks, forming a three hump shell. Once in position the laths, secured at the edges to curve base frame, created a stable structure which over time dried and seasoned, hardening to becoming a rigid curved building frame.
For more information and photographs of the construction visit https://www.cullinanstudio.com/project-downland-gridshell.
For more information about the Weald and Downland Living Museum visit https://www.wealddown.co.uk
--editor
[edit] Related articles on Designing Buildings
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.



























