Goods received note GRN
Goods received note (GRN) is a document that acknowledges the delivery of goods to a customer by a supplier and confirms that the goods have been received in a suitable condition by the customer. They may be internally generated by the customer as a project record or be a joint document between customer and supplier and form part of logistics in construction.
A delivery note or Proof of Delivery (POD) may refer to the same document, acting for both purposes but is usually produced by the supplier and acknowledged by the customer, in the case of a construction site, often a particular individual. These documents differ from Goods Despatched Notes (GDN) which are merely supplier documents confirming that a delivery has been shipped from its manufacturing base or warehouse.
A GRN is the record of goods that the buyer has received, and normally contains a description of the goods, the quantity of good, the date of delivery and the individual who inspected the goods. It used by the buyer to compare the goods ordered to those delivered, and is normally completed following a brief inspection of the items, their condition and number. It is then retained to compare to the supplier invoices or purchase orders for a particular project as well as the bills of quantities.
The information in the collected GRN's can also become significant as a body of information for contractual purposes in relating the contractor performance to that of the agreed construction programme or agreed costs. These can become especially important in scenarios where damaged goods or late deliveries have knock on effects causing programme or completion delays that have cost implications.
GRNs may also increasingly be used as evidence requirements for building or site environmental performance assessments, confirming the materials actually used in a building project, for example assessing product and site emissions, known as cradle to gate and gate to site emissions. They may also be a key part of any waste reduction programme both from the perspective of the over ordering of materials but also in terms of waste packaging.
[edit] Related articles on Designing Buildings
- BSI construction product identification system.
- Call-off contract.
- Construction buyer.
- Construction consolidation centre (CCC).
- Construction inventory management.
- Construction logistics manager.
- Construction logistics plan.
- Construction Logistics and Community Safety.
- Fleet operator.
- Fleet Operator Recognition Scheme.
- Forward-logistics.
- How to manage construction plant.
- Inventory.
- Lean construction.
- Lean construction - a quality perspective.
- Logistics data.
- Materials on site.
- Off site materials.
- Programme for building design and construction.
- Resource management.
- Reverse-logistics.
- Scheduling construction activities.
- Site logistics.
- Site storage.
- Supply chain management.
- Understanding agile in project management.
Featured articles and news
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.