Development proposal DP
Contents |
[edit] Introduction
Development, in terms of land, property or real estate, is a complex process of coordinating a range of activities to transform ideas and plans for the creation of a built asset into physical reality. As a business process, it typically involves the financing, construction, renovation or refurbishment of buildings and land in order to make a profit.
For more information see: Development.
A proposal is a plan, idea, suggestion or offer that is put forward for consideration and if accepted, may form the basis of future action.
In a general sense, a development proposal (DP) is an idea or plan that is presented for the purpose of exploring the creation of a site, built asset or activity. A development proposal may be presented to organisations or authorities for consideration and/or approval.
[edit] DPs in England
The National Planning Policy Framework (NPPF) sets out government planning policy for England. It was first published by the then Department for Communities and Local Government on 27 March 2012.
The 2021 update of the NPPF incorporated recommendations for DPs to consider when assessing sites that could be allocated for the creation of certain types of plans or for specific development applications. Under these recommendations, site assessment should ensure that the DP incorporates several characteristics, including:
- Appropriate opportunities to promote sustainable transport modes based on the type of development and its location.
- Safe and suitable access to the site for all users.
- The design of streets, parking areas, other transport elements and the content of associated standards reflecting current national guidance, including the National Design Guide and the National Model Design Code.
- Any significant impacts from the development on the transport network (in terms of capacity and congestion), or on highway safety, are cost effectively mitigated to an acceptable degree.
The NPPF also noted that any DPs within the National Forest and Community Forests in the Green Belt should be subject to the normal policies for controlling development in Green Belts.
[edit] DPs in Northern Ireland
In Northern Ireland, the term DP has a specific meaning associated with area planning for schools and related infrastructure. Article 14 of the Education and Libraries (NI) Order 1986 defines a DP as ‘...the statutory means by which proposed changes of significance to education provision can be affected. The changes proposed must align with the current Area Plan and Annual Action Plan for education provision’.
In Northern Ireland, a DP is required under Article 14 before any changes can be made to a school building. All DPs are published by the Education Authority (EA).
Legislation also requires that the Education Authority publish all DP advertisements in at least one of the newspapers distributed within the local vicinity of the proposed development. Once the advertisement for the DP is published, a two month period of comment - including support and objections - commences.
The Department of Education published Circular 2017/09 - Guidance on the publication of a Development Proposal (updated September 2018) which provides detailed guidance describing the DP process.
[edit] Related articles on Designing Buildings
- A guide to the updated National Planning Policy Framework.
- Business case for construction projects
- Consultant's proposals for design and construction.
- Local plan.
- National planning policy framework NPPF.
- Neighbourhood development order.
- Planning obligation.
[edit] External resources
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.






















