Conditional approvals are authorisations granted by a body such as a regulatory body that is subject to specific conditions being met. This type of approval typically indicates that the proposed construction project can proceed, but that certain requirements must be satisfied either before or during the development process.
For example, local planning authorities may grant conditional approval of planning applications. This means that while the overall project is acceptable, the developer must meet certain conditions either before work begins, or before occupation is permitted. These could include details of the design, adherence to environmental regulations, the implementation of specific mitigation measures, undertaking surveys and other assessments, and so on.
Similarly, conditional approval can also apply to compliance with building regulations. Building control bodies may approve plans conditionally, requiring certain aspects of the construction to be carried out or verified in a particular way to ensure compliance with health, safety, accessibility standards and so on.
Once conditional approval is granted, the developer or contractor must take steps to discharge these conditions. This typically involves submitting additional documentation, revised plans, or evidence of compliance. Only when all conditions are satisfactorily met will the project receive full approval..
Approving authorities may monitor the project to ensure compliance with the conditions. Failure to meet conditions can result in enforcement actions, which might include halting the project, fines, or requiring alterations to the work.
For more information see: Planning conditions.
NB Some other, non-statutory aspects of a project may also be subject to conditional approvals. For example, the contract might state that approval of certain goods, materials or works on site is subject to satisfactory inspection by the contract administrator.
[edit] Related articles on Designing Buildings
- Approval of conditions on a planning permission.
- building regulations.
- Community Infrastructure Levy.
- Condition.
- Deemed discharge of planning conditions.
- Detailed planning application.
- Discharge of planning conditions.
- Outline planning application.
- Planning conditions.
- Planning permission.
- Planning appeal.
- Planning enforcement.
- Planning obligation.
- Statutory approvals.
- Statutory authorities.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.
Grenfell investigation files passed to CPS
Angela Rayner apologises on behalf of the British state.
Electrical contractors need to understand the practical implications.
The real barrier to getting more value from digital technology.
Your guide to The Construction Reset at UKCW Birmingham.
Accommodating the Victorian and Edwardian working woman. Book review.
Rethinking passive fire protection in design
PFP demands the same level of design rigour as structure or services.
38% of Gen Zs feel safe when a fire door is wedged open.