BSRIA publishes new edition of BG29
BSRIA has published a new edition of its guide on pre-commission cleaning of pipework systems. BG 29/2020 is the sixth edition of this popular guide, replacing BG 29/2012.
Pre-commission cleaning is the process of bringing a closed heating or cooling system to a satisfactory state for commissioning and ongoing maintenance of water quality. System contaminants such as mill scale, jointing compound and building debris will inevitably be found in newly fabricated heating and cooling pipework systems. If allowed to remain in the system in sufficient quality, these contaminants will make the system prone to blockages at strainers, control valves and small-bore heat exchangers. They may also initiate further corrosion and encourage the growth of microorganisms.
Originally published in 1991, BG29 is essential reading for any company operating in the water management area. Providing clear and concise guidance, the publication has become a de facto standard within the industry.
The 6th Edition, developed in partnership with the Closed Systems Control Association (CSCA) and an industry steering group, includes several new topics:
- Cleaning precautions for thin-walled carbon steel pipes,
- Closed-loop pre-treatment cleaning (CPC) procedures,
- Pre-treatment options described in German directive VDI 2035[1],
- Corrosion monitoring solutions,
- Heat networks and low carbon systems.
March 2021 update
In March 2021, BSRIA published an amended version of BG29/2021: Pre-Commission Cleaning of Pipework Systems.This update takes into consideration various feedback received by the users of the previous version which was published in April 2020.
This amended version includes changes such as:
- Minor amendments to the system schematics and associated notes.
- Additional flexibility with respect to laboratory test methods.
- Clarification regarding systems with corrosion monitoring.
- Revised guidance regarding air venting at terminal units.
- Revised guidance regarding circulation.
- Revised guidance regarding heating to improve cleaning effectiveness.
- Revised guidance regarding temporary pumps.
- Expanded guidance to cover a wider range of non-UK guidelines.
The guide is available to download from the BSRIA website, with free downloads for BSRIA and CSCA members.
This article originally appeared on the BSRIA website as BSRIA publishes new edition of BG29: Pre-Commission Cleaning of Pipework Systems on 30 April 2020.
--BSRIA
[edit] Related articles on Designing Buildings Wiki:
- BSRIA.
- BSRIA articles on Designing Buildings Wiki.
- Chilled water.
- Closed Systems Control Association.
- Corrosion in heating and cooling systems.
- Domestic ventilation systems performance.
- Differential pressure control valve.
- Flow characteristics.
- Pressure independent control valves.
- Indoor air quality.
- Valves.
- What makes a good PICV?
Featured articles and news
Lighting Industry endorses Blueprint for Electrification
The Lighting Industry Association fully supports the ECA Blueprint as a timely, urgent call to action.
BSRIA Sentinel Clerk of Works Training Case Study
Strengthening expertise to enhance service delivery with integrated cutting-edge industry knowledge.
Impact report from the Supply Chain Sustainability School
Free sustainability skills, training and support delivered to thousands of UK companies to help cut carbon.
The Building Safety Forum at the Installershow 2025
With speakers confirmed for 24 June as part of Building Safety Week.
The UK’s largest air pollution campaign.
Future Homes Standard, now includes solar, but what else?
Will the new standard, due to in the Autumn, go far enough in terms of performance ?
BSRIA Briefing: Cleaner Air, Better tomorrow
A look back at issues relating to inside and outside air quality, discussed during the BSRIA briefing in 2023.
Restoring Abbotsford's hothouse
Bringing the writer Walter Scott's garden to life.
Reflections on the spending review with CIAT.
Retired firefighter cycles world to raise Grenfell funds
Leaving on 14 June 2025 Stephen will raise money for youth and schools through the Grenfell Foundation.
Key points for construction at a glance with industry reactions.
Functionality, visibility and sustainability
The simpler approach to specification.
Architects, architecture, buildings, and inspiration in film
The close ties between makers and the movies, with our long list of suggested viewing.
SELECT three-point plan for action issued to MSPs
Call for Scottish regulation, green skills and recognition of electrotechnical industry as part of a manifesto for Scottish Parliamentary elections.
UCEM becomes the University of the Built Environment
Major milestone in its 106-year history, follows recent merger with London School of Architecture (LSE).
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.